Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20042E204 + (ML20042E204)
- ML20042E206 + (ML20042E206)
- ML20042E207 + (ML20042E207)
- ML20042E214 + (ML20042E214)
- ML20042E216 + (ML20042E216)
- ML20042E218 + (ML20042E218)
- ML20042E219 + (ML20042E219)
- ML20042E221 + (ML20042E221)
- ML20042E222 + (ML20042E222)
- 05000458/LER-1990-007, :on 900311,control Bldg Ventilation Sys Isolated & Filtration Unit Initiated.Caused by Severe Electrical Transient.Performance of Radiation Monitors Improved Prior to Implementation of Procedures + (ML20042E223)
- ML20042E225 + (ML20042E225)
- BECO-90-052, Special Rept:On 900227,fire Protection Alarm Reporting Sys Inoperable for More than 14 Days.Compensatory Fire Watches Instituted in Affected Areas & Failure & Malfunction Rept 90-44 Written to Document Problem + (ML20042E226)
- ML20042E227 + (ML20042E227)
- ML20042E229 + (ML20042E229)
- ML20042E230 + (ML20042E230)
- ML20042E235 + (ML20042E235)
- ML20042E239 + (ML20042E239)
- ML20042E240 + (ML20042E240)
- ML20042E244 + (ML20042E244)
- ML20042E245 + (ML20042E245)
- ML20042E248 + (ML20042E248)
- ML20042E250 + (ML20042E250)
- ML20042E252 + (ML20042E252)
- ML20042E256 + (ML20042E256)
- ML20042E257 + (ML20042E257)
- ML20042E262 + (ML20042E262)
- ML20042E263 + (ML20042E263)
- LIC-90-0278, Responds to NRC Bulletin 88-008,Suppl 3, Thermal Stresses in Piping Connected to Rcs. Chronic Leakage from RCS to Safety Injection Lines Has Not Occurred + (ML20042E274)
- ML20042E276 + (ML20042E276)
- LIC-90-0263, Submits Update for Response to NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. Util Reinspected Hangers During 1990 Refueling Outage.No Evidence of Damage or Unacceptable Conditions Found + (ML20042E278)
- ML20042E279 + (ML20042E279)
- IR 05000245/1990006 + (ML20042E280)
- IR 05000410/2019301 + (ML20042E283)
- ML20042E284 + (ML20042E284)
- ML20042E288 + (ML20042E288)
- ELV-01535, Forwards Amend 17 to Security Plan.Amend Withheld (Ref 10CFR2.790) + (ML20042E291)
- ML20042E292 + (ML20042E292)
- ML20042E295 + (ML20042E295)
- ML20042E302 + (ML20042E302)
- ML20042E303 + (ML20042E303)
- ML20042E304 + (ML20042E304)
- ML20042E305 + (ML20042E305)
- U-601642, Monthly Operating Rept for Mar 1990 for Clinton Power Station,Unit 1 + (ML20042E307)
- 05000155/LER-1990-001-01, :on 900323,discovered That Proposed safety- Related Mod,Completed in Jul 1989,had Not Received PRC Review Prior to Implementation.Caused by Personnel Error. Incident Reviewed W/Engineering Staff + (ML20042E309)
- ML20042E310 + (ML20042E310)
- ML20042E311 + (ML20042E311)
- ML20042E312 + (ML20042E312)
- ML20042E316 + (ML20042E316)
- W3P90-0290, Monthly Operating Rept for Mar 1990 for Waterford 3 + (ML20042E317)
- ST-HL-AE-3434, Monthly Operating Repts for Mar 1990 for South Texas Project Electric Generating Station Units 1 & 2 + (ML20042E318)
- ML20042E319 + (ML20042E319)