Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20042A266 + (ML20042A266)
- ML20042A267 + (ML20042A267)
- ML20042A268 + (ML20042A268)
- ML20042A269 + (ML20042A269)
- ML20042A270 + (ML20042A270)
- ML20042A271 + (ML20042A271)
- ML20042A272 + (ML20042A272)
- ML20042A273 + (ML20042A273)
- IR 05000334/1981025 + (ML20042A274)
- ML20042A276 + (ML20042A276)
- ML20042A277 + (ML20042A277)
- ML20042A278 + (ML20042A278)
- IR 05000412/1981009 + (ML20042A281)
- ML20042A283 + (ML20042A283)
- ML20042A284 + (ML20042A284)
- ML20042A286 + (ML20042A286)
- ML20042A287 + (ML20042A287)
- ML20042A288 + (ML20042A288)
- IR 05000255/1981014 + (ML20042A290)
- 05000219/LER-1981-071, Forwards LER 81-071/01T-0.Detailed Event Analysis Encl + (ML20042A291)
- ML20042A293 + (ML20042A293)
- 05000219/LER-1981-071-01, /01T-0:on 811231,radwaste Liquid Effluent Monitor Found Inoperable.Proper Surveillance Not Performed.Caused by Personnel Error & Lack of Administrative & Procedural Controls.Control Procedures Written & Parts Replaced + (ML20042A294)
- ML20042A295 + (ML20042A295)
- ML20042A297 + (ML20042A297)
- ML20042A299 + (ML20042A299)
- ML20042A300 + (ML20042A300)
- GO2-82-318, Final Deficiency Rept Re Reverification of Weld Radiographs. Radiography Review to Be Completed by 820601.Filming of New Radiographs & Repair of Defective Welds Will Be Performed Per Turnover Schedule Priority + (ML20042A301)
- PNO-I-82-024, on 820314,light Plane Emergency Landing Occurred in Open Field on Licensee Property.No Fire or Injuries Resulted.Plane Removed + (ML20042A302)
- ML20042A303 + (ML20042A303)
- ML20042A304 + (ML20042A304)
- IR 05000245/1981016 + (ML20042A310)
- ML20042A312 + (ML20042A312)
- ML20042A313 + (ML20042A313)
- ML20042A314 + (ML20042A314)
- A02261, Responds to NRC Re Violations Noted in IE Insp Rept 50-245/81-16.Corrective Actions:Isolated Pressure Switch Valved Back Into Svc Immediately,Restoring Trip Sys to Required Min of Two Operable Channels + (ML20042A315)
- ML20042A318 + (ML20042A318)
- ML20042A321 + (ML20042A321)
- ML20042A323 + (ML20042A323)
- IR 05000285/1982001 + (ML20042A326)
- ML20042A327 + (ML20042A327)
- ML20042A328 + (ML20042A328)
- ML20042A330 + (ML20042A330)
- IR 05000313/1981034 + (ML20042A331)
- ML20042A333 + (ML20042A333)
- IR 05000341/1982002 + (ML20042A334)
- 05000331/LER-1982-013, Forwards LER 82-013/01T-0 + (ML20042A335)
- IR 05000443/1982001 + (ML20042A337)
- 1CAN028209, Responds to NRC Re Violations Noted in IE Insp Rept 50-313/81-34.Corrective Actions:Scheduled Nozzle Insp During Next Two Refueling Outages,Reviewed Tech Specs & Requested Approval of 771019 Tech Specs Change Requests + (ML20042A338)
- IR 05000373/1982002 + (ML20042A339)
- ML20042A341 + (ML20042A341)
- 05000331/LER-1982-013-01, /01T-0:on 820220,RHR Sys B Snubber GBB-3-SS-235 Removed from Svc for Testing.Caused by Snubber Pipe Clamp Rotated Out of Position & Bent Snubber Extension.Pipe Clamp Repositioned,Extension Straightened & Snubber Replaced + (ML20042A343)