Docket No. 50-293
Boston Edison Company M/C Nuclear
fp
ATTN: Mr. William D. Harrington
6
~ y-
Senior Vice President, Nuclear
x
yh
e
m,
800 Boylston Street
9
q
7, ,
Boston, Massachusetts 02199
.
Gentlemen:
\\k
' 3 bg b . [
3
p
Subject:
50-293/82-04
cib
f
O$
This refers to the routine safety :aspection conducted y Mr. W. A. Rekito of
this office on January 25-29, 198'. at Pilgrim Nuclear Power Station, Unit 1 of
activities authorized by NRC Licei,3e No. OPR-35 and to the discussions of our
findings held by Mr. Rekito with Mr. R. Machon af your staf f at the conclusion
of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliarce with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
These
items of noncompliance have been categorized into the levels described in the
Federal Register Notice (45 FR 66754) dated Octotar ?, 1980. You are required
to respond to this letter and in preparing your response, you should follow
the instructions in Appendix A.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC Public Document Room unless you notify this office,
,
I
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the require +ents
of 2.750(b)(1).
The telephone notification of your intent to request withholding,
or any request for an extension of the 10 day period which you believe necessary,
should be made to the Supervisor, Files, Mail and Records, USNRC Regien I, at
(215) 337-5223.
hr.t
[RI:DETP
- 6
RI:
P
RI:DETP
l
Rekito/ gwc
Bettenhausen
Ebngter
2/18/82
2]/4 n-
9lt[8V
/
OFFICIAL RECORD COPY
l
!
l
t
8203230341 820304
PDR ADOCK 05000293
G
- y
/
-
_.
.
.
Boston Edison Company M/C Nuclear
2
Your cooperation with us in this matter is appreciated.
Sincerely,
M} f
'
origina1 Signed 3ys
Thomas T. Martin, Director
Division of' Engineering and Technical
Programs
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC-Region I Inspection Report No. 50-093/82-04
cc w/encls:
A. V. Morisi, Manager, Nuclear Operations Support-
R. D. Machon, Nuclear Operations Manager - Pilgrim Station
Public Document Room (PDR)
local Public Document Room (LPDR)
!
,
Nuclear Safety Information Center (NSIC)
Commonwealth of Massachusetts (2)
NRC Resident Inspector
bcc w/encls:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
i
J
,
i
4
0FFICIAL RECORD COPY
,
A
f
4
4
,
,_
. . , . ,
,.
_..
,
, , _ . _ . ,
,
__
.
. . , _ _ . - , ,