0 4 1992

.

Docket No. 50-293

Boston Edison Company M/C Nuclear

fp

ATTN: Mr. William D. Harrington

6

~ y-

Senior Vice President, Nuclear

x

yh

e

m,

800 Boylston Street

9

q

7, ,

Boston, Massachusetts 02199

.

Gentlemen:

\\k

' 3 bg b . [

3

p

Subject:

50-293/82-04

cib

f

O$

This refers to the routine safety :aspection conducted y Mr. W. A. Rekito of

this office on January 25-29, 198'. at Pilgrim Nuclear Power Station, Unit 1 of

activities authorized by NRC Licei,3e No. OPR-35 and to the discussions of our

findings held by Mr. Rekito with Mr. R. Machon af your staf f at the conclusion

of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliarce with NRC requirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix A.

These

items of noncompliance have been categorized into the levels described in the

Federal Register Notice (45 FR 66754) dated Octotar ?, 1980. You are required

to respond to this letter and in preparing your response, you should follow

the instructions in Appendix A.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room unless you notify this office,

,

I

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the require +ents

of 2.750(b)(1).

The telephone notification of your intent to request withholding,

or any request for an extension of the 10 day period which you believe necessary,

should be made to the Supervisor, Files, Mail and Records, USNRC Regien I, at

(215) 337-5223.

hr.t

[RI:DETP

  1. 6

RI:

P

RI:DETP

l

Rekito/ gwc

Bettenhausen

Ebngter

2/18/82

2]/4 n-

9lt[8V

/

OFFICIAL RECORD COPY

l

!

l

t

8203230341 820304

PDR ADOCK 05000293

G

PDR

- y

/

-

_.

.

.

Boston Edison Company M/C Nuclear

2

Your cooperation with us in this matter is appreciated.

Sincerely,

M} f

'

origina1 Signed 3ys

Thomas T. Martin, Director

Division of' Engineering and Technical

Programs

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC-Region I Inspection Report No. 50-093/82-04

cc w/encls:

A. V. Morisi, Manager, Nuclear Operations Support-

R. D. Machon, Nuclear Operations Manager - Pilgrim Station

Public Document Room (PDR)

local Public Document Room (LPDR)

!

,

Nuclear Safety Information Center (NSIC)

Commonwealth of Massachusetts (2)

NRC Resident Inspector

bcc w/encls:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

i

J

,

i

4

0FFICIAL RECORD COPY

,

A

f

4

4

,

,_

. . , . ,

,.

_..

,

, , _ . _ . ,

,

__

.

. . , _ _ . - , ,