2DLC - 4521 (4 m 4564000 4M Seth Avenue Petteurgh. Pa MAR 101982 Mr. R. Haynes, Administrator United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 o
Attention:
Mr. Richard W. Starosteki Director, Division of Resident & Project Inspection
Subject:
BEAVER VALLEY POWER STATION - UNIT NC. 2 INSPECTION 50-412/81-09 DUCT BOLTING Gentlemen:
This is in response to the iter
'7 fraction cited in Inspection Report No. 50-412/81-09 and listed in App (Notice of Violation) attached to your letter to Mr. E. J. Woolever datt.ebruary 9, 1982.
NRC VIOLATION
).
10CFR50, Appendix B, Criterion,V and ANSI N45.2-6 require that quanti-tative criteria, such as dimensions and tolerances, shall be specified, as appropriate, for determining satisfactory work performance and quality compliance.
Contrary to the above, the Control Room Ventilation and Air Conditioning System was joined together by bolting without specified controls for hole sizes, tolerances in the job specification, work instructions, drawings, and/or standards.
Nhis is a Severity Level IV Violation.
RESPONSE
The following corrective actions are being ta' den:
q
-t 1.0 Corrective Action taken to date 1.1 For the duct connection identified,sall the nuts and bolts in
~
the duct connection sbail be removed and bolt holes' dimension measured. Bent bolt's shall be scrapped. Bolt holes which do not exceed the,specified bolt diameter,th 1/16 inch are
?,
acceptable.
' l' l
8203230285 820317
',/
{DRADOCK 05000412 PDR
\\
- Mr. R. Hrynaa, Administrator
^
Inspection 50-412/81-09 Duct Bolting Page 2 l'
..+
For bolt holes which exceed the specified bolt diameter by
. greater than 1/16 inch, suitably sized washers shall be
'provided to accomplish proper bearing surface. This corrective action has been provided in dispositioning DLC-SQC NSD 1905.
'i 1.2 For all installed 5/16 inch QA Category I duct _ connections,.
l f
each bolt will be removed and replaced with a new bolt, nut, and washers.
1.3 Specification 2PVS-935 will be revised to include the following statements.
"For all installed 5/16 inch QA Category I duct connections, each bolt will be removed and replaced with a new bolt, nut, and washers. For all future 5/16 inch bolted connections, washers shall be required. Vendor shall be instructed to use 3/8 inch punch."
2.0 Corrective Action taken to avoid future Violations 2.1 To prevent future violations from taking place on QA Category I duct connections, the specification 2BVS-935 will be revised as above.
In addition, the appropriate Inspection Plan will be revised to assure that the assembly meets the above-stated criterion.
3.0 Expected Completion 3.1 The corrective action for the presently installed duct con-nection shall be completed by January, 1984.
l DUQUESNE LIGHT COMPANY By mg.,
M ER-D. BECK, VICE PRESIDENT Attachment cc: NRC Document Control Desk Mr. G. Walton, Senior Resident Inspector Ms. E. Doolittle, Project Manager
a e
1 COMMONWEALTH OF PENNSYLVANIA )
)
SS:
COUNTY OF SLLEGHENY
)
On this
/#
day of Af//AdM'
/982-
, before me, toMAT.h W. RNANNnN a Notary Public in and for said Commonwealth and County, personally appeared R. D. Beck, who being duly sworn, deposed, and said that (1) he is Vice President of Duquesnc. Light, (2) he is duly authorized to execute and file the foregoing Submittal 4
on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge, information and belief.