Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20040G574 + (ML20040G574)
- 05000249/LER-1982-003, Forwards LER 82-003/03L-0 + (ML20040G576)
- 05000259/LER-1982-002-03, /03L-0:on 820106,drywell High Pressure Switch 1-PS-64-58C Found Isolated.Apparently Caused by Performance of Surveillance Instruction 4.2.B.5.Switch Returned to Normal & All Other Valving Involved Verified Correct + (ML20040G578)
- ML20040G579 + (ML20040G579)
- 05000266/LER-1982-002-03, /03L-0:on 820112,during Hot shutdown,1PT-469 Steam Generator Pressure Transmitter Isolated by Maint Personnel Due to Leaking Coupling.Pressure Sensing Tubing Showed Signs of Steam Leak Due to Freezing + (ML20040G580)
- 05000338/LER-1982-001, Forwards LER 82-001/03L-0 + (ML20040G581)
- ML20040G583 + (ML20040G583)
- 05000304/LER-1982-001, Forwards LER 82-001/03L-0 + (ML20040G584)
- ML20040G586 + (ML20040G586)
- ML20040G587 + (ML20040G587)
- 05000249/LER-1982-003-03, /03L-0:on 820115,during Steam Line Area Temp Switch Calibr Surveillance During Refueling Outage,Switch 3-261-16C Exceeded Tech Specs Limit of Less than or Equal to 200 F.Caused by Defective Temp Sensing Bulb.Switch Replaced + (ML20040G588)
- ML20040G589 + (ML20040G589)
- 05000304/LER-1982-001-03, /03L-0:on 820109,during Power operation,2C Steam Generator Pressure Channel 524 Failed High.Caused by Frigid Air Entering Transmitter Location Via Containment Tendon Tunnel Resulting in Frozen Sensing Line.Line Thawed + (ML20040G590)
- 05000338/LER-1982-001-03, /03L-0:on 820107,power Range Detector N-44 Drifted Low & Was Declared Inoperable.Quadrant Power Tilt Ratio Found Below Tech Spec Limit.Caused by Faulty Power Range Detector.Detector to Be Replaced During Refueling Outage + (ML20040G591)
- ML20040G592 + (ML20040G592)
- ML20040G593 + (ML20040G593)
- ML20040G594 + (ML20040G594)
- ML20040G595 + (ML20040G595)
- 05000339/LER-1982-002, Forwards LER 82-002/03L-0 + (ML20040G596)
- ML20040G598 + (ML20040G598)
- ML20040G599 + (ML20040G599)
- ML20040G601 + (ML20040G601)
- 05000305/LER-1982-001, Forwards LER 82-001/03L-0 + (ML20040G603)
- ML20040G605 + (ML20040G605)
- ML20040G606 + (ML20040G606)
- ML20040G607 + (ML20040G607)
- 05000305/LER-1982-001-03, /03L-0:on 820108,during Operability Check of Zone Special Ventilation,Exhaust Fan 1B Failed to Start.Caused by Failure of Solenoid Valve Due to Sticking Solenoid.Valve Replaced & Sys Tested.Design Change Initiated + (ML20040G608)
- 05000339/LER-1982-002-03, /03L-0:on 820110,during Mode 1 Operation at 20% Power,C Reactor Coolant Loop Flow Lost.Caused by Loss of Power During Transfer from Reserve Transformer.Unit Tripped Manually & Pump Restarted When Power Restored + (ML20040G609)
- ML20040G610 + (ML20040G610)
- ML20040G611 + (ML20040G611)
- ML20040G612 + (ML20040G612)
- 05000346/LER-1982-003, Forwards LER 82-003/03L-0 + (ML20040G613)
- ML20040G615 + (ML20040G615)
- ML20040G616 + (ML20040G616)
- ML20040G617 + (ML20040G617)
- ML20040G618 + (ML20040G618)
- 05000346/LER-1982-003-03, /03L-0:on 820208 & 10,door 400 Which Forms Part of Negative Pressure Boundary for Spent Fuel Pool Emergency Ventilation Sys Found Open.Caused by Faulty Door Closure Mechanism.Maint Order Issued for Corrective Action + (ML20040G619)
- ML20040G620 + (ML20040G620)
- ML20040G621 + (ML20040G621)
- ML20040G622 + (ML20040G622)
- 05000327/LER-1982-007, Forwards LER 82-007/03L-0 + (ML20040G623)
- ML20040G625 + (ML20040G625)
- ML20040G626 + (ML20040G626)
- 05000409/LER-1982-001, Forwards LER 82-001/01T-0.Detailed Event Analysis Submitted + (ML20040G628)
- ML20040G630 + (ML20040G630)
- ML20040G631 + (ML20040G631)
- 05000327/LER-1982-007-03, /03L-0:on 820108,in Mode 1 at 100% Power,Rod Position Indicator P-4 (Shutdown Bank a) Indicated Greater than 12 Steps Below Step Counter.Defective Indicator Recalibr & Returned to Svc.Connector Pins Cleaned + (ML20040G632)
- ML20040G633 + (ML20040G633)
- 05000409/LER-1982-001-01, /01T-0:on 820108,during Annual Test,Reactor Bldg Spray Valve Could Not Be Opened Using Manual Handwheel in Control Room.Caused by Separation of Coupling Between Valve & Shaft.Coupling Reconnected + (ML20040G634)
- ML20040G635 + (ML20040G635)
- ML20040G636 + (ML20040G636)