Fourth Interim Deficiency Rept Re Dimensionally Nonconforming Anchorage Matl,Initially Reported 810505.Util Awaiting Vendor Anchorage Measurements Before Finalizing Disposition of Deficiency.Also Reportable Per Part 21
ML20040G589
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 02/02/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-81 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8202160277
Download: ML20040G589 (2)


Text

J

~

8

.4 TENNESSEE VALLEY ~ AUTHOMUg cHATTAh 00GA, TENNESSEE 3740i Y.i f f

~*

400 Chestnut Street Tower II 2Y{9h All. _ g ~

Februar BLRD-50-438/81-33 BLRD-50-439/81-36 U.S. Nuclear Regulatory Commission Region II Att.n:

Mr. James P. O'Reilly, Regional Administrator

'101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - DIMENSIONALLY NONCONFORMING ANCHORAGE MATERIAL - BLRD-50-438/81-33, BLRD-50-439/81 FOURTH INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. V. Crlenjak on May 5, 1981 in accordance with 10 CFR 50.55(e) as NCR's 1447 and 1457. This as followed by our interim reports dated June 5, August 19, and November 12, 1981. Enclosed is cur fourth interim report. We expect to submit our next report by. April 15, 1982. TVA.

considers 10 CFR Part 21 to be applicable to this deficiency.

If you have any questions concerning this matter, please get in touch with R. F. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Regulation and Safety l

h !!?LI.

i Enclosure l

cc:

Mr. Richard C. DeYoung, Director (Enclosure)

(y

~:,

C Office of Inspection and Enforcement N/

~\\

i U.S. Nuclear Regulatory Commission y

t Washington, DC 20555 j

, 332 >

l

" ec l

2, l

,. W s

.x l

y/

y OFF!NAL C&V '

8202160277 820202 I.- b* h g

/

PDR ADDCK 05000438 An Equal Opportunity Employer j

///

b.

2

...g ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 DIMENSIONALLY NONCONFORMING ANCHORAGE MATERIAL BLRD-50-438/81-33, BLRD-50-439/81-36 10 CFR 50.55(e)

FOURTH INTERIM REPORT Description of Deficiency INRYCO, Incorporated, is the contractor, contract No. 75C53-85380, for supplying and installing the prestressing system for the primary containments at Bellefonte Nuclear Plant units 1 and 2.

On April 15, 1981, INRYC0 informed TVA that a shophead/ bushing failure had occurred during stressing operations on March 19, 1981 at the Braidwood Nuclear Plant and that INRYC0 had submitted a report in accordance with 10 CFR Part 21 to the Nuclear Regulatory Commission to document this failure. As a result of this failure, INRYC0 began measuring the unstressed anchorage material at Bellefonte. Several cases have teen documented whereby the dimensions measured do not fall within the tolerances established by the shop fabrication manual.

In some instances, the anchorage material is cversized and in other instances, the anchorage material is undersized.

Interim Progress The third interim report on this deficiency stated that Inryco had submitted their final report. TVA has evaluated Inryco's report and provided comments to Inryco.

Inryco has resubmitted the final report and TVA is now awaiting Inryco's submittal of all anchorage measurements before finalizing a disposition of this deficiency.

All NCR's concerning dimensionally nonconforming anchorage material will be handled under this report (BLRD-50-438/81-33, -439/81-36). To date these include 1447, 1457, 1461, 1469, 1473, ~ 1474, 1475, 1485, 1491, 1502, 1510, 1511, 1521, 1523, 1542, 1547, 1558, 1562, 1571, 1590, 1591, 1628, 1629, 1630, 1642, 1643, 1650, 1657, 1670, 1678, 1698, 1704, and 1712.