4 k'ainesYEdEridmner vce prescint ane cate Portland General Electric Ccxnpany
~
Legal Department 3hv.@x$rhrf40 OInsel.
Senior Assistant Genera Warren Hastings O
Renard M. Sancp?7 February 9, 1982 CFF c r ;--:frounset
[Assisfaht Geriera JameiC i.Sixendale l
Roland A. Johnson.
Ronald W. John StevenF.McdrhMg,d!/
Dorothy E. Rothrock Mr. Ivan W.
Smith, Chairman
,1 Atomic Safety and Licensing Board Panel
'b '
3 d.hgjy,3 UQ U.
S.
Nuclear Regulatory Commission T
Washington, D.
C.
20555 2
x,
b*jt
~
ss In the Matter of e t(a l'; s
.U Portland General Electric Company, FaiidC2 h i (Pebble Springs Nuclear Plant, Units Docket Nos. 50-514 and 50-515 b ~'
Dear Chairman Smith:
Mr. Bordenick, Counsel for the NRC Staff, has advised me that there is a problem respecting service of our Request for Clarification and that a number of the parties on the service list have not as yet received their copy of the Request.
Accordingly, I am, as of today, re-serving the entire service list and a copy of the Request is accordingly enclosed here-with.
Copies also have been made available to all parties on the service list.
Very truly yours, 17)v" Warren Hast ngs Enclosure 0148/G/dp 9 03 s
/
/
B202160327 820209 PDR ADOCK 05000514 O
PDR 1300 Wi!!amette Center 121 S.W. Salmon Street, Portland, Oregon 97204 (503)220-3000
___z___:-____
O.' f 7E UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 82 FEB 11 % #'
BEFORE THE ATOMIC SAFETY AND LICENSING BOARD "c -
Administrative JudgesI 2-Mr. Ivan W.
Smith, Chairman Dr. Walter H.
Jordan Dr. Oscar H.
Paris In the Matter of
)
)
PORTLAND GENERAL ELECTRIC
)
Docket Nos. 50-514 COMPANY, et al
)
50-515
)
(Pebble Springs Nuclear Plant,
)
Units 1 and 2)
)
APPLICANTS' REQUEST FOR CLARIFICATION OF OCTOBER 23, 1931 BOARD ORDER AND STATEMENT OF POSITION ON DATES FOR COMPLETION OF CONSTRUCTION I.
The Board in its Order of October 23, 1981 directed:
(1) it is appropriate to proceed with cer-tain discrete issues on alternate sites (except seismic) at this early stage of the consideration of a construction permit.", and (2) we will cali'for the position of the parties on the issue of the requirement for the applica tion to state the earliest and latest dates for completion of constryction."
II.
It is unclear to Applicants how and in what manner, if at all, seismic issues -will be treated in the evidentiary hear-ing on alternate sites now scheduled to commence on Mareb 30, l'382.
Tne Boarc did not provide in its~ Order of October 23, 1931 any basis for its decision to eliminate seismic issues
. q ~.
g.
e u-u
t from the alternate site hearing or explain which, if any, seismic issues are to be excluded assuming this was*the intent of tne Board's Order.
Consideration of geology and seismology is an integral part of the NRC staff's alternative site re/iew I1l.
None of the parties to this proceeding have made any supportable show-ing why geology and seismology issues should not be considered in tne alternate site hearing.
To properly prepare for the nearing, Applicants need to know what issues they should be prepared to meet.
In view o f this, Applicants therefore respectfully request the Board clarify its October 23, 1981 Order, it being toe Applicants' desire to proceed with all dis-crete issues on alternate sites, including seismic.
III.
Responding to the Board's request for a statement of position by Applicants on earliest and latest completion detes, fl Applicants would note the Application for Licence on file in tnis proceeding does set forth earliest and latest dates for completion of construction, as required by 10 CFR S0.33(h).
As noted in Applicants' letter to the Board of February 15, 1960, these dates are no longer attainable.
Considering the present uncertainties c'e la t ing, to regional needs and current impedi-ments to construction, 6ppl i ca n t's ' best estimate of dates for completion of tne construction are as follows:
Earliest Date Latest Date Unit 1 January 1993 January 1998 Unit 2 January 1996 January 2001 ~.
The Pebble Springs lic+.nse application will be further amended to reflect new construction completion dates prior to seneduling of further evidentiarf hearings on need-for-power and financial qualification issues.
IV.
Applicants therefore respectfully request a clarifica-tion by the Board of its October 23, 1981 Order.
Applicants further respectfully suomit their position on completion dates as directed by the Board.
Respectfully submitted,
//
A &av _/
7f 9 0 Wa r r e n' ila s t glig s Of Attorneys,for Applicants Dated at Portland, Oregon this 29th aay of January 1982.
[1]
See Sections 2.4.2.2.3 and 2.5.3 of " Supplement No. 1 to the Final Environmental Statement related to construction of Pebble Springs Nuclear Plant Units 1 and 2, April 1980".
[2]
The Application for License is included in the General Information volume of the Pebble Springs Preliminary Safety Analysis Report.
0139/G/dp i
-6
UNITED STATES OF AMERICA NUCLEAR. REGULATORY COMMISSION
'82 FEB 11: R0 :04 BEFORE THE ATOMIC SAFETY AND LICENSING BOARD M
0;L y
~'
EaD In the Matter of
)
}
Docket Nos. 50-514 PORTLAND GENERAL ELECTRIC
)
)
)
(Pebble Springs Nuclear Plant,
)
Units 1 and 2)
)
CERTIFICATE OF SERVICE I hereby certify that copies of Applicants' Request for Clarification of October 23, 1981 Board Order and Statement of Position on Dates for Completion of Construction has been served on the following by deposit in the United States mail, first class, this 9th day of February, 1982.
Judge Ivan W.
Snith Alan S.
Rosenthal, Chairman Chairman Atomic Safety and Licensing Atomic Safety and Licensing Appeal Board Board Panel U.S.
Nuclear Regulatory U.S.
Nuclear Regulatory Commission Commission Washington, DC 20555 Washington, DC 20555 Dr. Lawrence R. Quarles Dr. Oscar H.
Paris Atomic Safety and Licensing Atomic Safety and Licensing Appeal Board Board Panel U.S.
Nuclear Regulatory U.S.
Nuclear Regulatory Commission Commission Washington, DC 20555 Washington, D.C.
20555 Richard S.
Salzman, Esq.
Dr. Walter H. Jordan Atomic Safety and Licensing 881 West Outer Drive Appeal Board Oak Ridge, Tennessee 37830-U.S.
Nuclear Regulatory Commission
/
Atcmic Safety and Licensing Washington, DC 20555
(
Board Panel U.S.
Nuclear Regulatory Atomic Safety and Licensing Commission Appeal Board Wasnington, DC 20555 U.S.
Nuclear Regulatory Commission Washington, DC 20555 e-,
owe
>-e
v-r hernard M.
Bordenick, Esq..
Mr. Lloyd K. Marbet Counsel for NRC Staff Forelaws on Board, U.S.
Nuclear Regulatory 19142 S.
Bakers Ferry Road Commission Boring, Oregon 97009 Washington, DC 20555 Frank Josselson Docketing and Serr Section William L.
Hallmark Office of the Secretary R.
Elaine Hallmark U.S.
Nuclear Regulatory Eighth Floor Commission One S.W. Columbia Wasnington, DC 20555 Portland, Oregon 97258 Frank Ostrander, Esq.
J. Carl Freedman Assistant Attorney General Forelaws on Board State of Oregon Box 553 500 Pacific Building Cannon Beach, Oregon 97110 520 S.W.
Yamhill
~
Portland, Oregon 97204 fM Meo Warren Hast/ hgs Of Attorneys for Applicants 0002/G/dp 4