Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20040C784 + (ML20040C784)
- ML20040C786 + (ML20040C786)
- 05000321/LER-1981-140-03, /03L-0:on 811218,overheating Electrical Insulation Was Observed in Main Control Room.Caused by Loose Connection on Line Side of Fuse Block Resulting in Overheating.Jumper & Fuse Block Replaced + (ML20040C787)
- 05000339/LER-1981-089, Forwards LER 81-089/03L-0 + (ML20040C788)
- ML20040C790 + (ML20040C790)
- 05000321/LER-1981-133, Forwards LER 81-133/03L-0 + (ML20040C791)
- ML20040C793 + (ML20040C793)
- ML20040C794 + (ML20040C794)
- 05000321/LER-1981-133-03, /03L-0:on 811204,recombiner Bldg Vent Monitor P003A Was Found Inoperable.Sample Pump a Was Inoperable But Redundant Pump B Was Put in Svc & Sys Resumed Normal Operation.Caused by Pump Being Wired W/Improper Voltage + (ML20040C795)
- ML20040C796 + (ML20040C796)
- ML20040C798 + (ML20040C798)
- ML20040C799 + (ML20040C799)
- ML20040C801 + (ML20040C801)
- ML20040C802 + (ML20040C802)
- ML20040C803 + (ML20040C803)
- IR 05000278/1981032 + (ML20040C804)
- ML20040C805 + (ML20040C805)
- 05000324/LER-1981-130, Forwards LER 81-130/03L-0 + (ML20040C806)
- PNO-I-82-009A, on 820125,RCS at 822 psig,370 F.Bubble Drawn in Pressurizer & Pressurizer Leveled Out Near 50%.Cooldown Reduced to 5 F/H + (ML20040C808)
- 05000324/LER-1981-130-03, /03L-0:on 811210,variable Sensing Log Isolation Root Valve of Reactor Level Instrument Found Not to Hold Pressure & Automatic Depressurization Sys Declared Inoperable.Cause Not Determined.Penetration Test Completed + (ML20040C809)
- ML20040C810 + (ML20040C810)
- ML20040C811 + (ML20040C811)
- ML20040C813 + (ML20040C813)
- PNO-I-82-009, on 820125,primary to Secondary Leakage Indicated in Steam Generator B & Reactor Trip Initiated. Site Alert Declared & Upgraded to Site Emergency.Reactor Containment Isolated.All Levels Returned to Background + (ML20040C814)
- IR 05000322/1981023 + (ML20040C815)
- ML20040C816 + (ML20040C816)
- PNO-III-81-121A, Region 2,NRR & Resident Inspector Completed Review of 811228 Plant Scram.Licensee Plans to Take Reactor Critical 820122.Special Testing & Monitoring of Main & Reserve Transformer Breakers Will Be Performed + (ML20040C817)
- ML20040C818 + (ML20040C818)
- PNO-I-82-004A, on 820118,vehicle Owned by Us Priority Transport Co (non-licensee) Carrying Radioactive Matl Was Stolen.Boston Police Dept Recovered Vehicle Same Day.All Radioactive Contents Accounted for + (ML20040C819)
- ML20040C820 + (ML20040C820)
- ML20040C821 + (ML20040C821)
- ML20040C822 + (ML20040C822)
- PNO-I-82-010, on 820125,plant Will Be Shut Down for at Least 2 Days to Repair Leak in 12-inch Diameter Drain Line Between C Moisture Separator & Heater Drain Tank.Leak Is Blowing Steam Into Heater Bay Area + (ML20040C824)
- ML20040C825 + (ML20040C825)
- ML20040C826 + (ML20040C826)
- ML20040C827 + (ML20040C827)
- ML20040C828 + (ML20040C828)
- ML20040C829 + (ML20040C829)
- ML20040C830 + (ML20040C830)
- ML20040C831 + (ML20040C831)
- ML20040C832 + (ML20040C832)
- 05000261/LER-1981-034, Forwards LER 81-034/03L-0 + (ML20040C833)
- ML20040C835 + (ML20040C835)
- ML20040C836 + (ML20040C836)
- 05000366/LER-1981-132, Forwards LER 81-132/03L-0 + (ML20040C838)
- 05000366/LER-1981-132-03, /03L-0:on 811225,HPCI Turbine Trip & Exhaust Discharge Pressure Alarms Activated.Caused by Interference of Bourdon Tube.Spare Switch Backed Away from Tube.Calibr Procedure Revised + (ML20040C840)
- ML20040C841 + (ML20040C841)
- ML20040C842 + (ML20040C842)
- ML20040C843 + (ML20040C843)
- ML20040C844 + (ML20040C844)
- 05000251/LER-1982-001, Forwards LER 82-001/01T-0 + (ML20040C845)