Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20031G463 + (ML20031G463)
- ML20031G464 + (ML20031G464)
- 05000302/LER-1981-059-03, /03L-0:on 810905,during Performance of Operating Daily Surveillance Log,Remote Reactor Coolant Temp Instrument Found Inoperable.Caused by Stuck Meter.Meter to Be Replaced During Refueling Outage + (ML20031G465)
- 05000133/LER-1981-004, Forwards LER 81-004/03L-0 + (ML20031G467)
- ML20031G471 + (ML20031G471)
- 05000133/LER-1981-004-03, /03L-0:on 810914,during Shutdown,Screen Wash Pump 3 Showed Decreased Discharge Pressure.Caused by Second Stage Impeller Separating from Shaft Due to Impeller Locking Nut Off & Allowing Impeller to Spin Free of Shaft + (ML20031G472)
- ML20031G473 + (ML20031G473)
- ML20031G474 + (ML20031G474)
- ML20031G475 + (ML20031G475)
- ML20031G476 + (ML20031G476)
- ML20031G478 + (ML20031G478)
- 05000302/LER-1981-060, Forwards LER 81-060/01T-0 + (ML20031G479)
- 05000259/LER-1981-011-01, Analysis Indicated Potential Loss of Primary Containment If Purging Conducted During Hot Standby or Power Operations Concurrent W/Loca. Caused by Potential Failure of Dampers or Ductwork + (ML20031G481)
- ML20031G482 + (ML20031G482)
- 05000302/LER-1981-060-01, /01T-0:on 810928,during Reactor Coolant Sampling, Primary Coolant Dose Equivalent I-131 Found Exceeding Limit. Caused by Leaking Fuel.Sample Invalidated Due to Personnel Error.Rcs Purification Flow Increased + (ML20031G483)
- ML20031G484 + (ML20031G484)
- IR 05000250/1981022 + (ML20031G485)
- ML20031G486 + (ML20031G486)
- ML20031G487 + (ML20031G487)
- ML20031G489 + (ML20031G489)
- ML20031G493 + (ML20031G493)
- 05000312/LER-1981-047, Forwards LER 81-047/01T-0.Detailed Event Analysis Submitted + (ML20031G495)
- ML20031G497 + (ML20031G497)
- PNO-I-81-115B, on 811007,route Between Facilities Contaminated by P-32.Caused by Truck Leak of Approx 200 Mci P-32.Measurements Along Route Revealed Spots 1-2 Inches in Diameter W/Heaviest Contamination Near Loading Dock + (ML20031G498)
- 05000312/LER-1981-047-01, /01E-0:on 810930,bus a Emergency Pressurizer Heater Bank 3 Operated Intermittently Due to Loose Wire. Caused by Misoriented Screw Washer.Washer re-oriented & Screw Tightened + (ML20031G499)
- 2CAN108107, Forwards Info Re Topical MSS-NAI-P on Reactor Physics Methods,In Response to NRC 810304 Requests & Per Util 810806 Commitments + (ML20031G500)
- ML20031G501 + (ML20031G501)
- 05000344/LER-1981-021, Forwards LER 81-021/03L-0.Detailed Event Analysis Encl + (ML20031G502)
- PNO-I-81-115A, on 811007,approx 200 Mci P-32 Leaked from Waste Transport Truck.Health Physicists Found Contamination Spots at Facility W/Rates of 2-6 Milliroentgens Per Hour. Measurements on Site & Along Route to Be Taken + (ML20031G504)
- 05000344/LER-1981-021-03, /03L-0:on 810910,inadequate Ventilation Found for Train a Preferred Instrument & Control Power Buses.Caused by Insufficient ESF Ventilation Due to Fire Barriers Between a & B Trains.Room Ventilation Will Be Upgraded + (ML20031G505)
- ML20031G506 + (ML20031G506)
- ML20031G507 + (ML20031G507)
- ML20031G509 + (ML20031G509)
- ML20031G510 + (ML20031G510)
- PNO-V-81-054, on 811015,electrolyte Found Leaking from Battery Cells.Caused by Cracks in Battery Case.Leaking Cells Jumpered Out.Evaluation Continuing W/Manufacturer,Electra Corp + (ML20031G511)
- ML20031G513 + (ML20031G513)
- ML20031G514 + (ML20031G514)
- ML20031G515 + (ML20031G515)
- ML20031G516 + (ML20031G516)
- ML20031G518 + (ML20031G518)
- ML20031G519 + (ML20031G519)
- ML20031G521 + (ML20031G521)
- ML20031G523 + (ML20031G523)
- ML20031G524 + (ML20031G524)
- ML20031G526 + (ML20031G526)
- ML20031G527 + (ML20031G527)
- ML20031G528 + (ML20031G528)
- ML20031G530 + (ML20031G530)
- ML20031G531 + (ML20031G531)
- ML20031G532 + (ML20031G532)
- ML20031G534 + (ML20031G534)