Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20029D786 + (ML20029D786)
- ML20029D789 + (ML20029D789)
- 05000263/LER-1989-021, :on 890916,crack Was Discovered on Upper Support Brace of One Jet Pump Riser.Caused by High Cycle Fatigue.Testing Has Demonstrated That Cracking Is Self Limiting + (ML20029D790)
- ML20029D791 + (ML20029D791)
- ML20029D792 + (ML20029D792)
- NRC-94-4109, Forwards Proprietary Sketches on Design of Stage 4 of Automatic Depressurization Sys,In Support of Response to NRC RAI on AP600 (Q952.64).Sketches Withheld (Ref 10CFR9.17(a)(4)) + (ML20029D793)
- ML20029D794 + (ML20029D794)
- ML20029D795 + (ML20029D795)
- ML20029D796 + (ML20029D796)
- ML20029D797 + (ML20029D797)
- PNO-III-94-031, on 940427,truck Delivering Valves & Supplies to Licensee Found to Have Contamination That Measured 3.5 Mrem Each Hour on Floor of Cab.Origin of Contamination Not Identified Yet.State of Ky Conducting Survey on Driver Home + (ML20029D798)
- ML20029D799 + (ML20029D799)
- ML20029D800 + (ML20029D800)
- ML20029D801 + (ML20029D801)
- 05000334/LER-1994-003-01, :on 940404,two Flow Orifices Were Improperly Installed.Caused by Improper Installation of All Accessible Flow Orifices.Personnel Performed Procedure Ost 1.6.4 Correcting Improperly Installed Orifices + (ML20029D803)
- ML20029D804 + (ML20029D804)
- ML20029D805 + (ML20029D805)
- PNO-III-94-032, on 940420,cracks Found in Reactor Core Shroud H5 at Two Facilities.Licensee Developed Action Plan & Assembled Project Team to Characterize Crack & Develop Repair Options + (ML20029D806)
- ML20029D807 + (ML20029D807)
- ML20029D811 + (ML20029D811)
- ML20029D812 + (ML20029D812)
- IR 05000333/1994011 + (ML20029D813)
- 05000327/LER-1994-005, :on 940403,inadvertent Fwis Occurred.Caused by Personnel Failure to Follow Work Document Instructions. Corrective Action:Individuals Were Counseled on Requirements to Follow Work Document Instruction Steps + (ML20029D815)
- IR 05000443/1994003 + (ML20029D818)
- ML20029D820 + (ML20029D820)
- ML20029D821 + (ML20029D821)
- ML20029D822 + (ML20029D822)
- ML20029D823 + (ML20029D823)
- ML20029D825 + (ML20029D825)
- ML20029D826 + (ML20029D826)
- ML20029D827 + (ML20029D827)
- ML20029D828 + (ML20029D828)
- IR 05000440/1994004 + (ML20029D829)
- ML20029D830 + (ML20029D830)
- ML20029D831 + (ML20029D831)
- ML20029D832 + (ML20029D832)
- ML20029D834 + (ML20029D834)
- ML20029D838 + (ML20029D838)
- ML20029D839 + (ML20029D839)
- 0CAN059402, Responds to Severity Level III Problem During Insp of Activities Re Failure to Recognize That ANO Unit 1,exceeded TS Required Limiting Condition for Operation + (ML20029D841)
- ML20029D842 + (ML20029D842)
- ML20029D843 + (ML20029D843)
- ML20029D844 + (ML20029D844)
- ML20029D845 + (ML20029D845)
- ML20029D846 + (ML20029D846)
- ML20029D847 + (ML20029D847)
- ML20029D848 + (ML20029D848)
- 05000336/LER-1994-006-01, :on 940407,plant Did Not Meet Requirements of LCO 3.7.6.1 Re Two Independent Control Room Emergency Ventilation Sys.Caused by Inadequate Work Organization. Corrective Action:Revised OP 2315A + (ML20029D849)
- ML20029D850 + (ML20029D850)
- ML20029D851 + (ML20029D851)
- ML20029D852 + (ML20029D852)