Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20010E427 + (ML20010E427)
- ML20010E428 + (ML20010E428)
- B10257, Forwards Emergency Plan Procedures Listed in App D of Revision 9 to Facility Emergency Plan.W/O Encl + (ML20010E429)
- ML20010E430 + (ML20010E430)
- ML20010E431 + (ML20010E431)
- ML20010E432 + (ML20010E432)
- ML20010E434 + (ML20010E434)
- ML20010E438 + (ML20010E438)
- ML20010E441 + (ML20010E441)
- AECM-81-332, Submits Addl Info Re TMI Action Plan Item II.B.2,plant Shielding.Dose Contributions from Containment & Penetrations Were Combined W/Contributions from Contained Sources for Use in Item II.B.2 Evaluation + (ML20010E442)
- ML20010E444 + (ML20010E444)
- 05000293/LER-1981-044, Forwards LER 81-044/03L-0 + (ML20010E445)
- ML20010E446 + (ML20010E446)
- ML20010E447 + (ML20010E447)
- 05000293/LER-1981-044-03, /03L-0:on 810801,problems Encountered W/Start of Recirculation Pump Motor Generator Set P201A.Caused by Blown Capacitor,Preventing Scoop Tube Positioner from Entering Startup Position.High Speed Limiter Card Replaced + (ML20010E449)
- ML20010E450 + (ML20010E450)
- ML20010E451 + (ML20010E451)
- ML20010E453 + (ML20010E453)
- ML20010E454 + (ML20010E454)
- ML20010E455 + (ML20010E455)
- ML20010E458 + (ML20010E458)
- ML20010E459 + (ML20010E459)
- IR 05000317/1981014 + (ML20010E460)
- ML20010E461 + (ML20010E461)
- B10283, Forwards Safety Assessment Rept for SEP Topic IX-1 Re Fuel Storage,In Response to + (ML20010E462)
- ML20010E464 + (ML20010E464)
- ML20010E465 + (ML20010E465)
- AECM-81-286, Forwards Affidavit of Svc of Distribution of FSAR Amend 50 + (ML20010E467)
- ML20010E468 + (ML20010E468)
- ML20010E469 + (ML20010E469)
- ML20010E470 + (ML20010E470)
- ML20010E471 + (ML20010E471)
- ML20010E472 + (ML20010E472)
- ML20010E473 + (ML20010E473)
- IR 05000373/1981020 + (ML20010E474)
- B10275, Forwards Safety Assessment for SEP Topic III-3.C, Inservice Insp of Water Control Structures + (ML20010E475)
- ML20010E477 + (ML20010E477)
- B10295, Forwards Safety Assessment Rept for SEP Topic III-4.A, Tornado Missiles + (ML20010E483)
- IR 05000315/1981016 + (ML20010E484)
- B10272, Forwards Safety Assessment Rept for SEP Topic II-4.D Re Stability of Slopes + (ML20010E485)
- ML20010E486 + (ML20010E486)
- ML20010E490 + (ML20010E490)
- B10293, Forwards Safety Assessment Rept for SEP Topic II-4.D Re Stability of Slopes + (ML20010E491)
- ML20010E492 + (ML20010E492)
- AECM-81-333, Forwards Responses to Structural Engineering Branch 810827 Request for Addl Info.Attachment 4 Re Masonry Walls Supersedes 810824 Response + (ML20010E494)
- A01770, Submits Comments on NRC Final Evaluation for SEP Topic III-10.A Re Thermal Overload Protection for Motors of Motor Operated Valves.Also Provides Clarification of Status of Torque Switches + (ML20010E496)
- ML20010E497 + (ML20010E497)
- B10294, Forwards Safety Assessment for SEP Topic III-3.C, Inservice Insp of Water Control Structures + (ML20010E498)
- ML20010E499 + (ML20010E499)
- IR 05000454/1981009 + (ML20010E500)
- ML20010E502 + (ML20010E502)