Forwards IE Insp Repts 50-454/81-09 & 50-455/81-08 on 810729-31 & Notice of Violation
ML20010E492
Person / Time
Site: Byron  Constellation icon.png
Issue date: 08/24/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20010E493 List:
References
NUDOCS 8109040181
Download: ML20010E492 (2)


See also: IR 05000454/1981009

Text

,

.

-

.

.

AUG 2 41981

hk

D'g }]4 %*}

-

F.7

Docket No. 50-454

-

Docket No. 50-455

%

~61 SEP 0 31981* T3

Commonwealth Edison Company

M um"c%nPH

.

umm

ATTN:

Mr. Cordell Reed

m

Vice President

Y

7

Post Office Box 767

Y

Chicago, IL 60690

m

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. I. T. Yin

and D. E. Keating of this office and Mr. C. E. Johnson of IE: Region IV on

July 29-31, 1981, of activities at Byron Station, Units 1 and 2, authorized

by NRC Construction Permits No. CPPR-130 and L . CPPR-131 and to the

discussion of our findings with Mr. V. I. Schlosser and others of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection. certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in enclosed Appendix A.

A

written response, submitted *inder oath or affirmation. is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter, the enclosures, and your response to this letter will be

placed in the NRC's Public Document Room.

If the enclosures contain any

information that you or your contractors believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this

office by telephone within seven (7) days from the date of this letter of

your intention to file a request for withholding; and (b) submit within

twenty-five (25) days from the date of this letter a written application

to this office to withhold such information. Section 2.790(b)(1) requires

that any such application must be accompanied by an affidavit executed by

the owner of the information which identifies the document or part sought

to be withheld, and which contains a full statement of the reasons which

are the bases for the claim that the information should be withheld from

public disclosure. This section further requires the statement to address

with specif- ity the considerations listed in 10 CFR 2.790(b)(4). The

informatic a sought to be withheld shall be incorporated as far as possible

  1. I

gIS

St

8109040181 010Ba4

PDR ADOCK 05000454

G

PDR

-

- - - -

-

r

.

.

AUO 2 4 "'8I.

Commonwealth Edison Company

-2-

into a separate part of the offidavit.

If we do not hear from you in

this regard within the specified periods noted above, a copy of this

letter, the enclosures, and your response to this letter will be placed

in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

i

Sincerely,

d. Y. .)h

C. E Norelius, uirector

Division of Engineering and

Technical Inspection

Enclosures:

1.

Appendix A, Notice of

Violation

2.

IE Inspection Reports

No. 50-454/81-09 and

No. 50-455/81-08

cc w/encls:

Louis 0. DelGeorge

Director of Nuclear

Licensing

Gunner Sorensen, Site

Project Superintendent

V. I. Schlosser,

Project Manager

R. E. Querio, Station

Superintendent

DMB/ Document Contorl Desk (RIDS)

Mary Jo Murray, Office of

Assistant Attorney General

Myron M. Cherry

,

i

RI

RIII

RIII

RII

RI::I

_

_ Tji h

^hs

)

Yin /db

D'anie on