ML20010E455
| ML20010E455 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 08/21/1981 |
| From: | Keimig R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML20010E456 | List: |
| References | |
| NUDOCS 8109040143 | |
| Download: ML20010E455 (2) | |
See also: IR 05000317/1981014
Text
_
.
.
.
,
AUG 21 199g
Docket No. 50-317
'
qs
Baltimore Gas and Electric Company
Y (
m
)
t.
ATTN: Mr. A. E. Lundvall, Jr.
6
bN
Vice President, Supply
2
P. O. Box 1475
' r.
SEP 0 31ggy :3
Baltimore, Maryland 21203
-?
gsu
-
Gei;tlemen:
qi
Subject:
Inspection 50-317/81-14
N
as
This refers to the routine safety inspection conducted by Dr. J. W.
Chung of this of# ice on May 18-20, 1981 at Calvert Cliffs Unit 1, Lusby,
Maryland of activities authorized by NRC License No. CPR-53 and to the
discussions of our findings held by Dr. Chung with Mr. W. S. Gibson of
your staff at the conclusion of the inspection, and to a subsequent
telephone discussion between our Dr. CFung and Mr. Somma of your staff
on June 10, 1981.
Areas examined during this inspection are described in the Office of
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
4
7
Within the scope of this inspection, no items of noncompliance were
j
observed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a capy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any informatica
that you (or your contractors) believe to be exempt from disclosure
under 10 CFR 9.6(a)(4), it is necessary that you (a) notify this office
by telephone within ten (10) days from the date of this letter of your
intention to file a request for withholding; and (b) submit within 25
days from the date of this letter a written application to this office
to withhold such information
ConsistentAith section 2.790(b)(1), any
Cf'1:
-
RI:D PI
c G
.
,
,
.A
R1:DETI
"Rl:DETI
'
t
RI: DETI Chung/hh
Caphton
'd n
g eh
.
y
K
0FFICIAL req 0
PY
sist
h/l
8109040143 810821
PDR ADOCK 05000317
0
_.
.
_
.
_ _ _ - - . -
. _ .
-.
._
-
.
._
- _ - - _ _
_
_
. _ _ _
_ __ _
.-
- - . - _ _
.
.
'
<
Baltimore Gas and Electric Company
2
such application must be accompanied by an affidavit executed by the
owner of the informrMcn which identifies the document or part sought to
be withheld, and which contains a full statement-of the reasons on the
basis which it is claimed that tha information should be withheld-from
public disclosure.
This section further requires the statement to
address with specificity *.he considerations listed in 10 CFR 2.790(b)(4).
The information sought to be withheldshall be incorporated as far as
possible into a separate part of the affidavit.
If we do not hear from
you in this regard within the specified periods noted above, the report
.
vifil be placed in the Public Document Room. The telephone notification
of your intent to request withholding, or any request for an extension
of the 10 day period which you believe necessary, should be made to the
Supervisor, Files Mail and Records, USNRC Region I, at (215) 337-5223.
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
&
E-l, hAmtster
R. R. Keimig, Chief,
Projects Branch #2, Division of
Resident and Project Inspection
e
Enclosure: Office of Inspection and Enforcement Inspection
Report Number 50-317/81-14
cc w/ encl:
R. M. Douglass, Manager, Quality Assurance
'
L. B. Russell, Chief Engineer
s
W. S. Gibson, General Supervisor, Operations QA
R. E. Denton, General Supervisor, Training and Technical Services
Public 0x ument Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
State of Maryland (2)
NRC Resident Inspector
bcc w/ encl:
Region I Docket Room (with concurrences)
Dr. Steven Long, Administrator for Nuclear Evaluations
Chief, Operationai Support Section (w/o encl)
0FFICIAL RECORD COPY
l
L_-