ML20010E470

From kanterella
Jump to navigation Jump to search
Application to Amend Ol,Implementing New Hydraulic & Mechanical Snubber Surveillance Requirements
ML20010E470
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 08/28/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20010E471 List:
References
TVA-SNP-TS-13, NUDOCS 8109040160
Download: ML20010E470 (2)


Text

_

D q'

TENNESSEE VALLEY AUTHORITY CH ATTANOOG A. TENN ESSE 4 374o1 400 Chestnut Street Tower II August 28, 1981 TVA-SNP-TS-13 d

[

S4 SEP 0 319815 it u.a.mu um.

SMPAEM N

Mr. Harold R. Denton, Director Q

p*

Office of Nuclear Reactor Regulation m

U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

In the Matter of the

)

Docket No. 50-327 Tennessee Valley Authority

)

In accordance with the provisions of 10 CFR 50.59 and as requested by D. G. Eisenhut's letter dated November 20, 1980, my letter to you dated April 9, 1981 submitted a request for a license amendment to change the Sequoyah Nuclear Plant unit 1 technical specifications. This change would revise technical specification 3/4.7.9. to implement new hydraulic and mechanical snubber surveillance requirements. On April 17, 1981 we met with H. Shaw and M. Virgilio of your staff to discuss the proposed amendment. As a result of the meeting, we agreed to revise our proposal pursuant to NRC's comments. Enclosed is our revised proposed amendment.

Please note that this technical specification has already been implemented on Sequoyah unit 2.

In our meeting with your staff we agreed to visual inspection of all snubbers and retention of service life monitoring records for the duration of the operating license. We consider these to be interim requirements until better bases can be established for their reduction or deletion. We may at some future time request further revision to these requirements.

i Additionally, we agreed to develop performance change information to establish functional test methods to be used during and after the first l

refueling outage. Before the first refueling outage we will provide you with this information and propose any necessary technical specification changes.

8109040160 810828 DR ADOCK 05000327 L68 \\

PDR

[

An Equal Opportunity Employer

s

.* Mr. Harold R. Denton August 28, 1981 In addition to our meeting with your staff, we discussed the proposed technical specification format for listing snubbers with R. Kiessel (NRC-OIE). As a result of these discussions, we have reformated the tables which list the snubbers and reduced their bulk considerably.

In accordance with the requirements of 10 CFR Part -170.22, we have determined this proposed amendment to be Class III. This classification is based on the fact that the proposed amendment involves a single safety issue which does not involve a significant hazard consideration. The remittance of $11,000 was wired to the NRC, Attention:' Licensing Fee Management Branch, as stated in my letter to you dated April 9, 1981.

Very truly yours, TEdNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Regulation and Safety Swor t d subsc iced before me thi 0 - day of 1981 l

u Notary Public My Commission Expires Enclosure l

I 1

l q

,1

- - -