Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20005F082 + (ML20005F082)
- IR 05000352/1989020 + (ML20005F083)
- JPN-89-084, Forwards Application for Amend to License DPR-59,revising Tech Specs to Permit Continued Plant Operation W/Two Safety Relief Valves out-of-svc & to Change Setpoints for All Eleven Safety Relief Valves to Single Nominal Setpoint + (ML20005F084)
- ML20005F085 + (ML20005F085)
- ML20005F087 + (ML20005F087)
- ML20005F088 + (ML20005F088)
- ML20005F091 + (ML20005F091)
- ML20005F093 + (ML20005F093)
- ML20005F096 + (ML20005F096)
- ML20005F097 + (ML20005F097)
- ML20005F098 + (ML20005F098)
- ML20005F101 + (ML20005F101)
- ML20005F102 + (ML20005F102)
- ML20005F103 + (ML20005F103)
- ML20005F105 + (ML20005F105)
- LD-90-001, Forwards Application for Amend to License SNM-33,removing License Conditions 36 & 37 Re Addition of Poreformer & Lubricant Into New Pelletizing Lines in Bldg 254 & Presence of SNM Stored on Upper Levels Near Pelletizing Lines + (ML20005F106)
- ML20005F108 + (ML20005F108)
- ML20005F109 + (ML20005F109)
- ML20005F111 + (ML20005F111)
- ML20005F112 + (ML20005F112)
- ML20005F115 + (ML20005F115)
- ML20005F118 + (ML20005F118)
- ML20005F119 + (ML20005F119)
- ML20005F120 + (ML20005F120)
- ML20005F125 + (ML20005F125)
- ML20005F134 + (ML20005F134)
- ML20005F135 + (ML20005F135)
- ML20005F136 + (ML20005F136)
- ML20005F137 + (ML20005F137)
- ML20005F140 + (ML20005F140)
- ML20005F143 + (ML20005F143)
- ML20005F144 + (ML20005F144)
- 05000260/LER-1989-028-01, :on 891206,reactor Protection Sys Actuation Occurred Due to Trip Signal Generated by Low Scram Pilot Air Header Pressure.Caused by Failure of Soldered Connection. Connection Repaired + (ML20005F146)
- ML20005F147 + (ML20005F147)
- ML20005F149 + (ML20005F149)
- ML20005F151 + (ML20005F151)
- 05000368/LER-1989-023, :on 891117,noted That Channel a Not Responding to Change in Power Level & Declared Inoperable.Caused by Defective Preamplifier.Evaluation of Sys Design & Channel Functional Test Initiated + (ML20005F155)
- ML20005F156 + (ML20005F156)
- 05000313/LER-1989-043, :on 891208,discovered That Approx 50% of One Nut Ring Half Beneath Reactor Vessel Nozzle Flange Corroded Away.Caused by Gradual Deterioration of Gasket Matl.Design Change Implemented + (ML20005F157)
- ML20005F158 + (ML20005F158)
- 05000302/LER-1989-040, :on 891208,emergency Diesel Generators a & B Actuated Due to Degraded Voltage When Condensate Pump Started.Operator Guidelines & Procedures for Starting Condensate Pumps Being Revised + (ML20005F160)
- ML20005F161 + (ML20005F161)
- SNRC-1664, Forwards Application for Amend to License NPF-82,creating Defueled Facility Ol.Justification for Amend Provided in Encl Rept, Shoreman Nuclear Power Station Defueled Sar + (ML20005F163)
- ML20005F164 + (ML20005F164)
- ML20005F165 + (ML20005F165)
- ML20005F166 + (ML20005F166)
- PNO-III-90-002, on 900107,unit Automatically Shut Down as Result of Low Water Level in Reactor Vessel.Caused by Personnel Removing Wrong Control Power Fuses Resulting in Complete Deenergerization of 480 V Bus F1C + (ML20005F167)
- ML20005F168 + (ML20005F168)
- ML20005F170 + (ML20005F170)
- ML20005F171 + (ML20005F171)
- IR 05000285/1989046 + (ML20005F176)