Requests Final Rept for NRC Bulletin 80-10,incorporating Encl Changes,Per Acceptance of Rev 2 of Draft Closeout Rept
ML20005F101
Person / Time
Issue date: 01/05/1990
From: Berlinger C
Office of Nuclear Reactor Regulation
To: Foley W
PARAMETER, INC.
References
CON-NRC-05-85-157, CON-NRC-5-85-157 IEB-80-10, NUDOCS 9001120289
Download: ML20005F101 (3)


Text

,,

f(I3 3 l

i

[;,i

~, ;

January 5 1990

]

e.-

6 --

lMr. Walter J. Foley 1

Principal Investigator Parameter, Inc.

]

O

'13380 Watertown Plank Road

]

Elm Grove, Wisconsin ~53122

]

Re: -NRC Contract No. 05-85-157-02 PAR: NRC-157-02, Task 037 p

Sir:

i

SUBJECT:

-: ACCEPTANCE OF REVISION 2 0F THE CLOSE0VT REPORT ON

=

NRC BULLETIN 80-10 We have reviewed Revision 2 of the draft closeout report for_NRC Bulletin 80-10, as submitted on October 27,-1989 and find it to be acceptable subject to_

the changes as indicated in the marked-up copy enclosed.

The markups are

. consistent with discussions you have had with Peter Wen of ny staff.

Please prepare the final report incorporating the enclosed changes. The document may then be considered as the final-report.

Sincerely, Original Signed By Carl H. Berlinger Carl H. Berlinger,. Chief Generic Communications Branch Division of Operational Events Assessment l

Office of Nuclear Reactor Regulation l

Enclosure:

~ Marked-up. Copy of Bulletin 80-10 DISTRIBUTION w/ enclosure FM1raglia, NRR CERossi,_NRR CHBerlinger, NRR E

PCWen NRR JACalvo, NRR L

CHaughney, NRR ihn6aUSIEsY l

DCB DOEA R/F

'0GCB R/F PWen R/F Document Name:

LETTER TO AMETER ON 80-10 OfD.3 l

fi OGCB 0 NRR C/0G B:00EA:NRR PCWen CHBer, linger 01/E/90 01/[/90 NBC FPJ CENTER COPY L

Jgg n;gge, 90020s Misc.

puu j

A

. _. _ _ _.. ~

.~ _ _ _ _ _

i j

Enclosure January 5, 1990

f.,

]

APPENDIX C J

Proposed Follouup Item Region I

~

Haddam Neck ME. NEXT PACE.

T bulletin is held open in Inspection Report 50-

/81-11 (01-

- 2).

A completed review of:non-liquid stems was schedule r January 1, 1982.

In Inspection Rep 50-213/82-08 83), the bulletin is referred to in a r eu of a n-site soil contamination investigation.

The bulle atus is not mentioned.

According to Inspect Report 89

' (05-02-89), a

-technician.ident ed a unmonitored re se path.

This issue of Bull n 80-10 is brought to the ention of the utility i e letter of transmittal.

i i

I.

l-l y.-

l L

C-1 L

i.

v-

[.t.

e

(

c 3

i o

~

i.

-F W Followup Itam.

Haddam Neck h

The bulletin is held open'in NRC Inspection Report 50-213/81-11 (01-27-82). The licensee's response to this bulletin is hamad on its engineering review, which is documented in licensee 1%L EN-tD-153,-

dated May 27,1980, entitled " Contamination of Nonradioactive System 1

and Resulting Potential for Unmanitored, and Ga.uhviled Release of

, c._

Radioactivity to Enviu.=uit, IE Bulletin No. 80-10, CRP 80-342."

During this insMion, NRC region-hamad inspectors reviewed this 4

report and concluded that tim licensee's response was inocuplete because no non-liquid systems, such as instrument air and nitami-

. systems, had been included.

In NRC Inspection Report 50-213/82-08 (01-14-83), the bulletin is referred to in a review of an on-site soil contamination I

investigation. However, the status of the bulletin is not mentioned.

1:

/

According to NRC Inspection Report 50-213/89-02 (05-02-89), a licensee technician found an unmonitored radioactive release path o

h that had existed through the Spent Ebel Building floor drains. The issue of Bulletin 80-10 was brought to the attention of the utility l

'in the transmittal letter for.this inspection report. Based on the l !-

d[=maion between the NRR project manager arxl senior resident inspector, the resident inspector will continue to follow up this issue.

.r

+

  • r-r

- e e

s----

r

- -