Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19344F425 + (ML19344F425)
- ML19344F426 + (ML19344F426)
- ML19344F427 + (ML19344F427)
- 05000368/LER-1980-062-03, /03L-0:on 800801:during Startup Test Procedures Review for RCS Calorimetric Flow Rate Test,Power Uncertainty Bias Terms in Core Protection Calculators Revealed Calibr Tolerance Less Constant than Tech Spec Requirements + (ML19344F428)
- 05000368/LER-1980-066, Forwards LER 80-066/03L-0 + (ML19344F430)
- ML19344F431 + (ML19344F431)
- 05000312/LER-1980-039, Forwards LER 80-039/01T-0 + (ML19344F432)
- ML19344F434 + (ML19344F434)
- ML19344F435 + (ML19344F435)
- 05000368/LER-1980-066-03, /03L-0:on 800811,during Mode 1 operation,hi-hi Containment Pressure Trip Was Received on Plant Protective Sys Channel D.Other Channels Reported Normal Pressures. Caused by Power Supply Failure on Bistable Card + (ML19344F436)
- 05000312/LER-1980-039-01, /01T-0:on 800813,while Proceeding to Cold Shutdown,Reactor Protection Sys Was Placed in Shutdown Bypass Mode & Nuclear Overpower Trip Setpoint Not Reduced to Less than 5% of Rated Power.Caused by Personnel Error + (ML19344F437)
- 05000368/LER-1980-065, Forwards LER 80-065/03L-0 + (ML19344F438)
- ML19344F439 + (ML19344F439)
- 05000368/LER-1980-065-03, /03L-0:on 800812,while Performing Surveillance Testing on Containment Spray & Sump Valves,Containment Sump Recirculation Valve Failed.Caused by Valve Operator Overload Breaker Tripping Due to Foreign Matl in Switch Contacts + (ML19344F440)
- ML19344F441 + (ML19344F441)
- ML19344F442 + (ML19344F442)
- ML19344F443 + (ML19344F443)
- ML19344F444 + (ML19344F444)
- 05000302/LER-1980-035, Forwards LER 80-035/03L-0 + (ML19344F445)
- ML19344F446 + (ML19344F446)
- 05000321/LER-1980-101, Forwards LER 80-101/03L-0 + (ML19344F447)
- ML19344F448 + (ML19344F448)
- 05000302/LER-1980-035-03, /03L-0:on 800816,during Startup operation,post- Accident Monitoring Instrumentation Found Inoperable.Caused by Instrument Drift.Instrumentation Recalibr & Verified Operable + (ML19344F449)
- 05000321/LER-1980-101-03, /03L-0:on 800819,Standing Order 80-45, Scram Discharge Vol Residual Water or Vacuum Determination, Was Not Performed.Caused by Personnel Error + (ML19344F450)
- BECO-80-211, Application for Proposed Change 80-3 to License DPR-35,re Definition of Operable as Applied to Single Failure Criterion for Safety Sys.Request Is in Response to IE Info Notice 79-35 & NRC .Fee Encl + (ML19344F451)
- ML19344F452 + (ML19344F452)
- ML19344F453 + (ML19344F453)
- ML19344F454 + (ML19344F454)
- ML19344F455 + (ML19344F455)
- 05000321/LER-1980-102, Forwards LER 80-102/03L-0 + (ML19344F456)
- ML19344F457 + (ML19344F457)
- ML19344F458 + (ML19344F458)
- ML19344F460 + (ML19344F460)
- 05000321/LER-1980-102-03, /03L-0:on 800821,while at Steady State Power,B LPCI Inverter Tripped Making B Loop of RHR Inoperable.Caused by High Ambient Temp.Temporary Cooling Is Being Used Until Installation of Permanent Chillers Is Complete + (ML19344F461)
- 05000321/LER-1980-100, Forwards LER 80-100/01T-0 + (ML19344F462)
- ML19344F463 + (ML19344F463)
- 05000321/LER-1980-100-01, /01T-0:on 800822,util Notified by Bechtel That Seismic Piping Support Was Not Installed.Apparently Caused by Poor Communication W/Designer Re Addition of Support to Original Analysis.Support Installed + (ML19344F465)
- ML19344F466 + (ML19344F466)
- ML19344F467 + (ML19344F467)
- ML19344F469 + (ML19344F469)
- ML19344F470 + (ML19344F470)
- ML19344F471 + (ML19344F471)
- ML19344F472 + (ML19344F472)
- ML19344F473 + (ML19344F473)
- ML19344F474 + (ML19344F474)
- ML19344F475 + (ML19344F475)
- ML19344F476 + (ML19344F476)
- ML19344F479 + (ML19344F479)
- ML19344F481 + (ML19344F481)
- ML19344F482 + (ML19344F482)
- ML19344F483 + (ML19344F483)