ML19344F446

From kanterella
Jump to navigation Jump to search
Forwards LER 80-035/03L-0
Date released: 12/24/2019 Download: ML19344F446


LER 80-035/03L-0:on 800816,during Startup operation,post- Accident Monitoring Instrumentation Found Inoperable.Caused by Instrument Drift.Instrumentation Recalibr & Verified Operable
ML19344F449
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/08/1980
From: Lancaster K
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19344F449 (2)
Forwards LER 80-035/03L-0
ML19344F445
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/11/1980
From: Hancock J
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19344F445 (1)