Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000327/LER-1980-134-03, /03L-0:on 800705,while in Mode 3,lower Compartment Weighted Average Temp Found to Exceed Limit.Caused by Failure of One of Lower Compartment Door Latches to Hold Insp Door Closed.Latch Repaired + (ML19331C768)
- 05000327/LER-1980-123, Forwards LER 80-123/03L-0 + (ML19331C769)
- ML19331C770 + (ML19331C770)
- 05000289/LER-1980-015, Forwards LER 80-015/04T-0 + (ML19331C771)
- ML19331C772 + (ML19331C772)
- 05000336/LER-1980-026, Forwards LER 80-026/01T-0 + (ML19331C773)
- ML19331C774 + (ML19331C774)
- 05000327/LER-1980-135-03, /03L-0:on 800711,ice Condenser Inlet Doors Opened Due to Differential Pressure Created by Both Lower Compartment Doors Being Open Simultaneously.Caused by Design/Mfg Problem.Design Change Request Submitted + (ML19331C775)
- 05000327/LER-1980-123-03, /03L-0:on 800716,shield Bldg Vent Radiation monitor,1-RM-90-100R,declared Inoperable When Count Rate Found Out of Tolerance.Caused by Defective Photomultiplier Tube & Scintillator Detector Assembly.Parts Replaced + (ML19331C776)
- 05000289/LER-1980-015-04, /04T-0:on 800721,while Units Were in Cold Shutdown Condition,Actual River Water Temp Exceeded Tech Spec Limits for 6-h.Caused by Inaccurate Compensation for Resistance Temp Detector Lead Resistance During Calibr + (ML19331C777)
- 05000327/LER-1980-131-03, /03L-0:on 800626,review of SI 137.1 Test Data Revealed Surveillance Requirement 4.4.6.2.b Not Performed within Prescribed Interval.Caused by Personnel Oversight. Addl Personnel Made Available as Necessary + (ML19331C778)
- 05000336/LER-1980-026-01, /01T-0:on 800729,plugged Yard Storm Drain Caused Rainwater Backup & Leakage of 18 Inches in Lower Level of Auxiliary Bldg.Caused by Faulty Water Seals for Piping Penetrations Into Refueling Water Storage Tank Tunnel + (ML19331C779)
- ML19331C780 + (ML19331C780)
- 05000278/LER-1980-012-03, /03L-0:on 800520,during Full Power Operation, Routine Testing Revealed Pressure Switch 5121B Setpoint at 700 Psi Above Tech Spec.Caused by Personnel Error.Setpoint Adjusted.Technician Instructed + (ML19331C781)
- ML19331C782 + (ML19331C782)
- ML19331C783 + (ML19331C783)
- ML19331C784 + (ML19331C784)
- ML19331C785 + (ML19331C785)
- ML19331C787 + (ML19331C787)
- ML19331C788 + (ML19331C788)
- 05000278/LER-1980-011-03, /03L-0:on 800516,during Power Operation,Instrument Surveillance Test Revealed Setpoint for Pressure Switch 3-2-128B at 33 Psi Above Tech Spec.Caused by Barksdale Model PIH-M8555-V Pressure Switch Setpoint Drift + (ML19331C789)
- ML19331C791 + (ML19331C791)
- ML19331C792 + (ML19331C792)
- 05000213/LER-1980-011, Forwards LER 80-011/03L-0 + (ML19331C793)
- ML19331C795 + (ML19331C795)
- ML19331C796 + (ML19331C796)
- ML19331C797 + (ML19331C797)
- ML19331C799 + (ML19331C799)
- ML19331C800 + (ML19331C800)
- 05000327/LER-1980-126, Forwards LER 80-126/03L-0 + (ML19331C801)
- ML19331C802 + (ML19331C802)
- 05000312/LER-1980-035, Forwards LER 80-035/041-0 + (ML19331C803)
- ML19331C805 + (ML19331C805)
- ML19331C806 + (ML19331C806)
- AECM-80-178, Forwards GE Field Instruction FDI-35/42382 Re Capping of Control Rod Drive Return Line Nozzle.Program Will Be Implemented During Aug 1980 as Section XI Repair.W/O Encl + (ML19331C807)
- 05000312/LER-1980-035-41, /041-0:on 800703,plant Effluent Ph Momentarily Exceeded Acceptable Operating Band.Caused by Small Vol of off-std Water Being Trapped in Waste or Dilution Water Conduits.Automatic Diversion Sys Realigns Water Offsite + (ML19331C808)
- ML19331C809 + (ML19331C809)
- ML19331C810 + (ML19331C810)
- ML19331C811 + (ML19331C811)
- 05000213/LER-1980-012, Forwards LER 80-012/03L-0 + (ML19331C812)
- ML19331C814 + (ML19331C814)
- ML19331C815 + (ML19331C815)
- 05000327/LER-1980-126-03, /03L-0:on 800627,while in Mode 3,two Sets of Lower Containment Purge Exhaust Valves Found Open.Caused by Reactor Operator Error.Operator Cautioned & Further Training Initiated + (ML19331C816)
- ML19331C817 + (ML19331C817)
- 05000213/LER-1980-012-03, /03L-0:on 800717,during Precritical Checks,Reactor Coolant Pump 2 Seal Water Supply Bypass Valve Stem Bushing Broke,Allowing Valve to Go Full Open.Caused by High Closing Torque & Valve Misapplication.Vendor Will Investigate + (ML19331C818)
- ML19331C820 + (ML19331C820)
- 05000267/LER-1980-035, Forwards LER 80-035/03X-1 + (ML19331C821)
- ML19331C822 + (ML19331C822)
- 05000213/LER-1980-011-03, /03L-0:on 800801,investigation Revealed That Surveillance Leak Testing of Containment Personnel Hatch Had Not Been Performed Since Refueling Outage.Caused by Personnel Oversight.Computerized Schedule Sys Developed + (ML19331C823)
- ML19331C824 + (ML19331C824)
- 05000267/LER-1980-035-03, /03X-1:on 800625,during Regeneration,Condensate Polisher Resin,Waste Water Was Discharged to Plant Effluent Sys Rather than Waste Neutralizing Tank.Caused by Failed Beckman Conductivity Cell.Cell Replaced + (ML19331C825)