Forwards Proposed Change to App a Tech Spec Which Increases low-low Steam Generators Level Reactor Trip Setpoint from 10% to 12%.Safety Evaluation Indicated Proposed Change Does Not Provide Unreviewed Safety Question
ML19331C805
Person / Time
Site: Beaver Valley
Issue date: 08/14/1980
From: Woolever E
DUQUESNE LIGHT CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML19331C806 List:
References
TAC-42623, NUDOCS 8008190574
Download: ML19331C805 (3)


Text

e pc<

b den

'A@

(412) 456-6000 435 Sista Avenue Q*g"8"*

August 14, 1980 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attn:

Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 Request For Amendment No. 53 to Operating License Gentlemen:

Enclosed are three (3) signed originals and thirty-seven (37) copies of a proposed change to the Beaver Valley Power Station Appendix A Technical Specifications which. increases the Low-Low Steam Generator Level Reactor Trip setpoint from 10% to 12%.

1 Safety Evaluation I.E.Bulletin 79-21 notified licensee s of the effect of increased containment temperature on the reference leg water columns of safety related liquid level measuring systems and the resultant effect on indi-cated water level. As a result of our review, the Low-Low Steam Generator Level Reactor Trip setpoint was administratively controlled at 20% of level span until permanent corrective action could be taken.

After discussions with our NSSS supplier, Westinghouse Electric l

C'orporation, we determined that to minimize reference leg heatup due to l

increased containment temperature, insulation should be applied to the reference leg water columns. This modification has been completed in accordance with instructions provided by Westinghouse.

Establishing the trip setpoint at 12 percent, ~as recommended by Westinghouse, incorporates errors due to the following:

1.

Normal Channel Accuracy 2.

AP transmitter deviation due to a high containment temperature following a secondary high energy line rupture. Maximum transmitter deviation that could be experienced for at least 5 minutes following reactor trip are included.

l 90081905?1 g

t m

6' Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 Request For Amendment No. 53 to operating License Page 2 3.

Reference leg heatup due to a high containment temperature following a secondary high energy line rupture.

Maximum errors that could be experienced for at least 5 minutes following rupture initiation are included.

Error due to the reference leg heatup could not be completely accounted for by insulating, which accounts for the 2 percent increase in the trip setpoint. The new setpoint maintains the basis in the Technical Specification accounting for error due to (3) above.

The OSC and ORC have reviewed the proposed change to the Technical Specifications and have determined that there are no safety implications associated with the change and that the change does not provide an unreviewed safety question.

We have determined this change to be a Class III license amendment and are enclosing a check for $4,000 in accordance with 10CFR170.22.

Very truly yours, C'

E.

. Woolever Vice President, Engineering and Construction Enclosures cc:

Mr. D. A. Beckman, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, Pennsylvania 15077 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555 6

9 O

A

(CORPORATE SEAL)

Attest:

  1. 1a h e.-, e to

,[/

Joan S. SengppshyM Assistant Secretary COMMONWEALTH OF PENNSYLVANIA)

) SS:

COUNTY OF ALLEGHENY On this 14th day of August 1980,.

before me, DONATM W. RMANWON a Notary Public in and for said Commonwealth and County, personally appeared E.

J. Woolever, who being duly sworn, deposed, and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing submittal on. behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge, information and belief.

)

~