Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19324B398 + (ML19324B398)
- ML19324B404 + (ML19324B404)
- ML19324B407 + (ML19324B407)
- 05000413/LER-1989-025-02, :on 890922,13.8 Kv Auxiliary Switchgear Deenergized Resulting in Loss of Power to Condenser Circulating Water Cooling Tower Fans.Power Reduction Due to Hurricane Hugo + (ML19324B409)
- ML19324B412 + (ML19324B412)
- BSEP-89-0971, Followup Ro:On 890422,limiting Condition for Operation Initiated Re Two Inoperable Fire Barrier Seals in Common Augmented Offgas Bldg.Caused by Corrosion in Base Metal Hatch.Replacement Parts Obtained to re-establish Operation + (ML19324B421)
- ML19324B428 + (ML19324B428)
- 05000324/LER-1989-008, :on 890605,unplanned LOCA Initiation Signal Occurred During Routine Maint Surveillance Testing of ECCS, Resulting in Autostarting of Core Spray a & B & RHR LPCI Pumps A,B,C & D.Caused by Spurious Trip + (ML19324B431)
- ML19324B432 + (ML19324B432)
- ML19324B434 + (ML19324B434)
- ML19324B436 + (ML19324B436)
- ML19324B437 + (ML19324B437)
- 0CAN108919, Forwards Supplemental Info Re 890815 Applications for Amends to Licenses DPR-51 & NPF-6,concerning Antitrust Considerations.Sys Agreement Provides for Coordination on sys-wide Basis of Operation of Stated Facilities + (ML19324B438)
- ML19324B439 + (ML19324B439)
- ML19324B440 + (ML19324B440)
- ML19324B442 + (ML19324B442)
- ML19324B445 + (ML19324B445)
- ML19324B447 + (ML19324B447)
- IR 05000498/1989027 + (ML19324B450)
- ML19324B452 + (ML19324B452)
- ML19324B453 + (ML19324B453)
- ML19324B455 + (ML19324B455)
- ML19324B458 + (ML19324B458)
- ML19324B460 + (ML19324B460)
- IR 05000458/1989035 + (ML19324B461)
- ML19324B464 + (ML19324B464)
- ML19324B465 + (ML19324B465)
- ML19324B466 + (ML19324B466)
- ML19324B468 + (ML19324B468)
- NL-89-534, Responds to B Hayes Re Purchase of Components Involving Procurement of Electrical Components from Planned Maint Sys,Inc + (ML19324B470)
- ST-HL-AE-3260, Annual Summary Rept Re 10CFR50.59 Evaluations,Describing Changes,Tests & Experiments Associated W/Plant + (ML19324B473)
- ML19324B474 + (ML19324B474)
- ML19324B475 + (ML19324B475)
- ML19324B477 + (ML19324B477)
- ML19324B480 + (ML19324B480)
- ML19324B482 + (ML19324B482)
- PY-CEI-NRR-1075, Provides Individual Plant Exam Method & Schedule,Including Schedule for Submittal of Final Results,Per Generic Ltr 88-20,Suppl 1,dtd 890829.Bid Evaluation in Progress & Award of Individual Plant Exam Contract Scheduled for 891124 + (ML19324B487)
- PY-CEI-NRR-1080, Advises of Completion of Addl Licensed Operator Training on Response to Degraded Air Sys,Per Generic Ltr 88-14,dtd 890222 + (ML19324B488)
- ML19324B489 + (ML19324B489)
- ML19324B490 + (ML19324B490)
- ML19324B492 + (ML19324B492)
- ML19324B494 + (ML19324B494)
- ML19324B496 + (ML19324B496)
- ML19324B497 + (ML19324B497)
- ML19324B499 + (ML19324B499)
- ML19324B500 + (ML19324B500)
- ML19324B502 + (ML19324B502)
- ML19324B503 + (ML19324B503)
- ML19324B505 + (ML19324B505)
- 05000424/LER-1989-018-01, :on 891002,steam Generator 1 Train a MSIV Failed to Close,Resulting in Automatic Reactor Trip.Caused by Blown Fuse in Control Logic Power Supply.Grounding Corrected & Limit Switch & Fuse Replaced + (ML19324B512)
- ML19324B515 + (ML19324B515)