Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19323B540 + (ML19323B540)
- ML19323B541 + (ML19323B541)
- ML19323B543 + (ML19323B543)
- 05000366/LER-1980-069, Forwards LER 80-069/03L-0 + (ML19323B544)
- ML19323B545 + (ML19323B545)
- 05000333/LER-1980-034, Forwards LER 80-034/03L-0 + (ML19323B546)
- ML19323B547 + (ML19323B547)
- 05000259/LER-1980-029, Forwards LER 80-029/03L-0 + (ML19323B548)
- ML19323B549 + (ML19323B549)
- ML19323B550 + (ML19323B550)
- 05000344/LER-1980-006, Forwards LER 80-006/01T-0 + (ML19323B551)
- 05000259/LER-1980-029-03, /03L-0:on 800407,HPCI Turbine Tripped Due to Failed Rupture Disc in Turbine Exhaust Line.Teflon Sheet Failed Providing No Protection to Rupture Disc.Cause of Teflon Sheet Failure Unknown.Disc Replaced + (ML19323B553)
- 05000333/LER-1980-034-03, /03L-0:on 800410,during Surveillance Testing,Hpci Pump Min Flow Valve Failed to Close.Caused by Cocked Brush Holder on Dc Drive Motor.Entire Motor Replaced & Valve Restored to Operable Status Approx 8-h After Discovery + (ML19323B554)
- ML19323B555 + (ML19323B555)
- ML19323B557 + (ML19323B557)
- 05000327/LER-1980-030, Fowards LER 80-030/03L-0 + (ML19323B558)
- ML19323B559 + (ML19323B559)
- 05000344/LER-1980-006-01, /01T-0:on 800425,during Preplanned Fuel Insp Program,Two Fuel Assemblies Found to Have Abnormal Clad Degradation.Caused by water-jet Impingement on Fuel Pins Via Enlarged Baffle Plate Joint Gap + (ML19323B560)
- 05000327/LER-1980-030-03, /03L-0:on 800407,during Preventive Maint,Low Flow Switch to Waste Disposal Sys Liquid Effluent Monitor RO-90-122 Found Inoperable.Caused by Small Particulate Matter in Liquid.Design Change Request Initiated + (ML19323B562)
- ML19323B563 + (ML19323B563)
- 05000366/LER-1980-069-03, /03L-0:on 800421,while Performing HPCI Sys Rated Flow Test 2E41-F012,min Flow Control Valve Began Cycling from Full Closed to Full Open for No Apparent Reason.Caused by Component Failure.Flow Switch Replaced & Returned to Sv + (ML19323B566)
- ML19323B567 + (ML19323B567)
- ML19323B569 + (ML19323B569)
- ML19323B571 + (ML19323B571)
- ML19323B572 + (ML19323B572)
- ML19323B573 + (ML19323B573)
- ML19323B574 + (ML19323B574)
- ML19323B575 + (ML19323B575)
- ML19323B576 + (ML19323B576)
- ML19323B577 + (ML19323B577)
- ML19323B578 + (ML19323B578)
- ML19323B579 + (ML19323B579)
- ML19323B580 + (ML19323B580)
- ML19323B582 + (ML19323B582)
- ML19323B583 + (ML19323B583)
- PNO-III-80-062A, on 800107 & 08,per Request,Employee Was Examined to Determine Whether He Received Intake of Pu While Employed from 1969-1972 at Plant.Exam Detected Neither Pu Nor Am + (ML19323B585)
- ML19323B586 + (ML19323B586)
- ML19323B588 + (ML19323B588)
- IR 05000348/1980008 + (ML19323B589)
- ML19323B590 + (ML19323B590)
- ML19323B591 + (ML19323B591)
- ML19323B593 + (ML19323B593)
- ML19323B594 + (ML19323B594)
- ML19323B595 + (ML19323B595)
- ML19323B596 + (ML19323B596)
- ML19323B597 + (ML19323B597)
- ML19323B599 + (ML19323B599)
- ML19323B600 + (ML19323B600)
- ML19323B601 + (ML19323B601)
- ML19323B604 + (ML19323B604)
- ML19323B605 + (ML19323B605)