Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19311C779 + (ML19311C779)
- ML19311C783 + (ML19311C783)
- ML19311C784 + (ML19311C784)
- ML19311C785 + (ML19311C785)
- ML19311C789 + (ML19311C789)
- ML19311C795 + (ML19311C795)
- ML19311C796 + (ML19311C796)
- ML19311C801 + (ML19311C801)
- ML19311C803 + (ML19311C803)
- ML19311C804 + (ML19311C804)
- 1CAN111901, Response to Request for Additional Information Related to Request for Relief from American Society of Mechanical Engineers (ASME) Code Case N-729-4 Supplemental Examination Requirements ANO1-ISI-033 + (ML19311C822)
- ML19312A025 + (ML19312A025)
- ML19312A034 + (ML19312A034)
- ML19312A040 + (ML19312A040)
- ML19312A042 + (ML19312A042)
- ML19312A048 + (ML19312A048)
- ML19312A049 + (ML19312A049)
- ML19312A050 + (ML19312A050)
- PMNS20191250, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) + (ML19312A052)
- IR 05000220/2019003 + (ML19312A053)
- ML19312A054 + (ML19312A054)
- ML19312A056 + (ML19312A056)
- ML19312A063 + (ML19312A063)
- 05000346/LER-2019-003, Anticipatory Reactor Trip System Actuated During Turbine Stop Valve Testing Due to the Closure of a Main Turbine Stop Valve + (ML19312A071)
- ML19312A072 + (ML19312A072)
- CP-201900638, Request to Delay the Code of Record for the Inservice Inspection Program, Relief Request Number 1A4-1 + (ML19312A073)
- L-19-264, Emergency Response Data System (ERDS) Change to Current Virtual Private Network + (ML19312A074)
- ML19312A076 + (ML19312A076)
- ML19312A077 + (ML19312A077)
- ML19312A082 + (ML19312A082)
- ML19312A095 + (ML19312A095)
- ML19312A096 + (ML19312A096)
- ML19312A097 + (ML19312A097)
- ML19312A098 + (ML19312A098)
- ML19312A102 + (ML19312A102)
- ML19312A108 + (ML19312A108)
- NRC-19-0054, DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle + (ML19312A110)
- CNL-19-113, Supplement to Application to Modify Watts Bar Nuclear Plant Unit 2 Technical Specifications 3.7.8 to Extend the Completion Time for an Inoperable Essential Raw Cooling Water Train on a One-Time Basis (WBN-TS-18-07) + (ML19312A111)
- ML19312A113 + (ML19312A113)
- ML19312A114 + (ML19312A114)
- ML19312A116 + (ML19312A116)
- IR 05000244/1978023 + (ML19312A118)
- ML19312A121 + (ML19312A121)
- ML19312A124 + (ML19312A124)
- ML19312A125 + (ML19312A125)
- IR 05000366/1978044 + (ML19312A126)
- ML19312A128 + (ML19312A128)
- 05000285/LER-1978-012, Forwards LER 78-012/03L-1 + (ML19312A129)
- ML19312A130 + (ML19312A130)
- ML19312A131 + (ML19312A131)
- 05000285/LER-1978-012-03, /03L-1 on 781229:during Routine Maint of Charging Pump CH-1B,crack in Valve Block at Piston 3 Was Found.Caused by Excessive Vibration During Operation + (ML19312A132)