Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000327/LER-1980-033, Forwards LER 80-033/03L-0 + (ML19305E805)
- ML19305E806 + (ML19305E806)
- ML19305E807 + (ML19305E807)
- 05000327/LER-1980-033-03, /03L-0:on 800411,while Core Component Pot 1-A Was Removed from Svc & 1-B Placed in Svc W/Diesel Generator 1B Out of svc,1-B Was Being Powered from Inoperable Shutdown Board.Caused by Not Verifying Generator Operability + (ML19305E808)
- ML19305E809 + (ML19305E809)
- 05000327/LER-1980-036, Forwards LER 80-036/03L-0 + (ML19305E810)
- ML19305E811 + (ML19305E811)
- ML19305E812 + (ML19305E812)
- 05000318/LER-1980-023, Forwards LER 80-023/03L-0 + (ML19305E813)
- ML19305E814 + (ML19305E814)
- 05000327/LER-1980-036-03, /03L-0:on 800413,when Source Range N-31 Was Removed from Svc,Action Statement LCO 3.9.2 Was Initiated Due to Only One Source Range Channel Being in Svc.Caused by Need to Inspect for Possible Water Damage + (ML19305E815)
- PNO-I-80-060, on 800417,Bechtel Advised Util That IE Bulletin 79-01B Pipe Break Analysis for HPCI Turbine Steam Supply Line Showed That Guillotine Break in Either Valve Isolation Rooms Adjacent to Drywell Would Overpressurize Room + (ML19305E816)
- 05000266/LER-1980-006, Forwards LER 80-006/03L-0 + (ML19305E817)
- ML19305E818 + (ML19305E818)
- ML19305E819 + (ML19305E819)
- 05000266/LER-1980-006-03, /03L-0:on 800417,during Analysis of as-built safety-related Piping Sys Per IE Bulletin 79-14,overstressed Condition Discovered in Cooling Sys Piping.Caused by Lack of Support Between Valves Upstream of Juncture + (ML19305E821)
- 05000298/LER-1980-009, Forwards LER 80-009/03L-0 + (ML19305E822)
- ML19305E823 + (ML19305E823)
- ML19305E824 + (ML19305E824)
- 05000298/LER-1980-009-03, /03L-0:on 800329,during Refueling outage,through- Wall Crack Discovered on Upstream Side of Isolation Valve to REC Noncritical Header.Cracked Weld Characteristic of Intergranular Stress Corrosion.Weld Will Be Repaired + (ML19305E825)
- ML19305E826 + (ML19305E826)
- ML19305E827 + (ML19305E827)
- ML19305E828 + (ML19305E828)
- ML19305E829 + (ML19305E829)
- ML19305E830 + (ML19305E830)
- ML19305E832 + (ML19305E832)
- 05000267/LER-1980-020, Forwards LER 80-020/03L-0 + (ML19305E833)
- ML19305E834 + (ML19305E834)
- ML19305E835 + (ML19305E835)
- ML19305E837 + (ML19305E837)
- ML19305E838 + (ML19305E838)
- ML19305E839 + (ML19305E839)
- ML19305E840 + (ML19305E840)
- ML19305E841 + (ML19305E841)
- ML19305E842 + (ML19305E842)
- ML19305E843 + (ML19305E843)
- ML19305E845 + (ML19305E845)
- 05000304/LER-1977-069, Forwards Updated LER 77-069/03X-1 + (ML19305E847)
- ML19305E849 + (ML19305E849)
- ML19305E850 + (ML19305E850)
- ML19305E851 + (ML19305E851)
- 05000304/LER-1977-069-03, During Operability Test PT-11,O-diesel Generator Tripped Due to Split Pipe Nipple. Caused by Cyclic Fatigue.Nipples Replaced W/Ss Fittings & Tubing Rerouted to Reduce Cyclic Fatigue + (ML19305E852)
- ML19305E853 + (ML19305E853)
- ML19305E854 + (ML19305E854)
- ML19305E855 + (ML19305E855)
- ML19305E856 + (ML19305E856)
- ML19305E857 + (ML19305E857)
- ML19305E859 + (ML19305E859)
- ML19305E860 + (ML19305E860)
- ML19305E861 + (ML19305E861)
- ML19305E862 + (ML19305E862)