Requests That Licensee Review Experiences Re Loss of Offsite Power.Any Identified Events Should Be Submitted W/Response to Encl within 30 Days
ML19305E827
Person / Time
Site: Crane 
Issue date: 05/05/1980
From: Reid R
Office of Nuclear Reactor Regulation
To: Arnold R
METROPOLITAN EDISON CO.
References
NUDOCS 8005200488
Download: ML19305E827 (5)


Text

.

80 052 00'Arj

$AO-f' p mato99

,7 UNITED STATES

.?

o NUCLEAR REGULATORY COMMISSION p

WASHINGTON, D. C. 20555 k...../

May 5, 1980 Docket No. 50-289 Mr. R. C. Arnold Senior Vice President Metropolitan Edison Conpany 100 Interpace Parkway Parsippany, New Jersey 07054

Dear Mr. Arnold:

RE: LOSS OF 0FFSITE POWER EVENTS We are currently reviewing the adequacy of the offsite power systems of nuclear power plants and in particular, the loss of offsite power events at your facility. One aspect of this review concerns the history of experienced total and partial power outages and attendent degraded voltage or frequency conditions of the grid.

In our review of this matter we have drawn upon the information provided to us via Licensee Event Reports and followup letters which have been sent to us. Our records do not indicate that you have experienced any loss of offsite power events either completely or partially.

Please review your experiences and, if any ere identified, then report them in answer to this letter and furnish the related information as included in the enclosure.

Please provide your response for the Three Mile Island Nuclear Station, Unit No.1 within 30 days of the receipt of this letter.

Sincerely, Robert W. Reid, Chief Operating Reactors Branch #4 Division of Licensing

Enclosure:

)

Request for Additional Information cc w/ enclosure:

See next page

Metropolitan Edison Company er H. J rdan Oak Ridge, Tennessee 37830 ccw/enclosur-(s):

Mr. Marvin I. Lewis Dr. Linda W. Little 6504 Bradford Terrace 5000 Hermitage Drive P, hila delphia, Pennsylvania 19149 Raleigh, North Carolina 27612 Walter W. Cohen, Cons mer Advocate Holly S. Keck Department of Justice Anti-Nuclear Group Representing Strawberry Square,14th Floor York Harrisburg, Pennsylvania 17127 245 W. Philadelphia Street York, Pennsylvania 17404 Robert L. Knupp, Esq.

Assistant Solicitor John Levin, Esq.

Knupp and Andrews Pennsylvania Public Utilities Comm.

P.O. Box P Box 3265 407 N. Front Street Harrisburg, Pennsylvania 17120 Harrisburg, Pennsylvania 17108 Jordan D. Cunningham, Esq.

J:hn E. Minnich, Chairman Fox, Tarr and Cunningham Dauphin Co. Board of Com'issioners 2320 North 2nd Street Dauphin County Courthouse Harrisburg, Pennsylvania 17110 Front and Market Sts.

Harrisburg, Pennsylvania.17101 Theodore A. Adler, Esq.

WIDOFF REAGER SELK0WITZ & ADLER o Atomic Safety and Licensing Appeal Board Post Office Box 1547 U.S. Nuclear Regulatory Commission Harrisburg. Pennsylvania 17105 Washington, D. C.

20555 Hs. Marjorie M. Aamodt 0 Atomic Safety and Licensing Board Panel R.D. #5 U.S. Nuclear Regulatory Commission Coatesville, Pennsylvania 19320 Washington, D. C.

20555 Ms. Karen Sheldon Docketing and Service Section f7 o

St ee N.

U.S. Nuclear Regulatory Commission Suite 506 Washington, D. C.

20555 Washington, D. C.

20006 Robert Q. Pollard Earl B. Hoffman Chesapeak Energy Alliance

'609 Montpelier Street Dauphin County. Comissioner Baltimore, Maryland 21218 Dauphin County Courthouse Front and Market Streets Chauncey Kepford Harrisburg, Pennsylvania 17101 Judith H. Johnsrud Ellyn Weiss, Esq.

Environmental Coalition on Nuclear Power Sheldon Harmon, Roisman & Weiss he50 433 Orlando Avenue State College, Pennsylvania 16801 Washington, D.C.

20006 Ms. Frieda Berryhill, Chairman

' Coalition for Nuclear Power Plant Mr. Steven C. Sholly Postponement 304 South flarket Street 2G10 Grendon Drive Mechanicsburg, Pennsylvania 17055 Wilmington, Delaware 19808 Mr. Thomas Gerusky Mrs. Rhoda D. Carr Bureau of Radiation Protection 1402 Marene Drive Department of Enwonmental Resour as P.O. Box 2063 Harrisburg, Pennsylvania 17109 Harrisburg, Pennsylvania 17120

Satropolitan Edison Company Karin W. Carter, Esq.

505 Executive House Mr. G. P. Miller P. 0. Box 2357 Mr. R. F. Wilson Harrisburg, Pennsylvanis 17120 Mr. J. J. Barton Metropolitan Edison Company Honorable Mark Cohen 512 E-3 Main Capital Building P. O. Box 480 Middletown, Pennsylvania 17057 Harrisburg, Pennsylvania 17120 G. F. Trowbridge, Esquire Dauphin County Office Emergency Shaw, Pittman, Potts & Trowbridge Preparedness 1800 M Street, N.W.

Court House, Room 7 Washington, D. C.

20036 Front & Market Streets Harrisburg, Pennsylvania 17101 Mr. E. G. Wallace r

Licensing Manager Department of Environmental Resources "P ra ATTN:

Director, Of fice of Radiological erp ce Park a Parsippany, New Jersey 07054 Post Office ox 2063 Harrisburg, Pennsylvania 17105 Pennsylvania Electric Company Mr. R. W. Conrad Director, Technical Assessment Vice President, Generation Division 1001 Broad Street Office of Radiation Programs Johnstown, Pennsylvaria 15907 (AW-459)

U. S. Environmental Protection Agency Miss Mary V. Southard, Chairman Crystal Mall #2 Citizens for a Safe Environment Arlington, Virginia 20460 Post Office Box 405 Harrisburg, Pennsylvania 17108 Mr. Robert B. Borsum Babcock & Wilcox Government Publications Section Nuclear Power Generation Division State of Library of Pennsylvania Suite 420, 7735 Old Georgetown Road Box 1601 (Education Building)

Bethesda, Mar:iand 20014 Harrisburg, Pennsylvania 17126

  • Ivan W. Smith, Esq.

Mr. David D. Maxwell, Chairman Atomic Safety A Licensing Board Panel Board of Supervisors U.S. Nuclear Regulatory Commission Londonderry Townr. hip Washington, D. C.

20555 RFD#1 - Geyers Church Road Middletown, Pennsylvania 17057 Ms. Kathy McCaughin Three Mile Island Alert, Inc.

U. S. Environmental Protection Agency 23 South 21st Street Region III Office Harrisburg, Pennsylvania 17104 ATTN:

EIS COORDINATOR Curtis Building (Sixth Floor)

Mr. L. N. Harding 6th and Walnut Streets Supervisor of Licensing Philadelphia, Pennsylvania 19106 Metropolitan Edison Company Mr. J. G. Herbein P. O. Box 480 Vice President-Nuclear Operations

'41ddletown, Pennsylvania 17057 Metropnlitan Edison Compary P. O. Bax 480 Middletown, Pennsylvania 17057 Ms. Jane i.ee R.D. 3; Box 352T' Etters, Pennsylvania 17319 l

Metropolitan Edison Company Mr. R. J. Toole Manager TMI-l Metropolitan Edison Company Governor's Office of State Planning P. O. Box 480 and Development Middletown, PA 17057 ATTN: Coordinator, Pennsylvania State Clearinghouse Mr. W. E. Potts P. O. Box 1323 Radiological Controls Manager, TMI-l Harrisburg, Pennsylvania 17120 Metropolitan Edison Company P. O. Box 480 Middletown, PA 17057 Mr. I. R. Finfrock, Jr.

Jersey Central Power & Light Company Madison Avenue at Punch Bowl Road Morristown, New Jersey 07950 J. B. Lieberman, Esq.

Berlock, Israel, Lieberman 26 Broadway New York, NY 10004 Mr. J. J. Colitz Plant Engineering Manager, TMI-l Metropolitan Edison Company P. O. Box 480 Middletown, Pennsylvania 17057 York College of Pennsylvania Country Club Road York, Pennsylvania 17405 Mr. G, K. Hovey Director, THI-2 Metropolitan Edison Company P, 0, Box 480 Middletown, PA 17057 Mr. B. Elam Manager, Plant Engineering, Unit 2 Metropolitan Edison Company P. O. Box 480 Middletown, PA 17057 Mr. Richard Roberts The Patriot 812 Market Street s

Harrisburg, PA 17105 Mr. R. W. Heward Manager, Radiological Control, Unit 2 Metropolitan Edison Company P. O. Box 480 Middletown, Pennsylvania 17057

.a

~

LOSS OF OFFSITE POWER SURVEY

  • Enclosure A.

For losses of offsite power where less than all offsite power was lost:*

1.

How many circuits to the effsite netw'ork are normally available and how many were lost during the event?

2.

What was the cause of the event?

l 3.

Why did the other line's not fail when some did fail?

4.

Was any voltage in' crease dr decrease experienced just prior to or during the outage?

If so, please give details, voltages redched, affects, etc.

5.

Was any frequency decay experienced jus't prior to or during the outage?

If so, please give details, lowest frequency reached, decay rate, affects on equipment operation, etc..',.

How long was power unavailable from the circuith 6.

7.

Date of event.

.B., For losses of all offsite power:

1.

How long was the power off? How long for partial recovery?

Please give details.

2.

If-turbine trip occurred, how soon after did loss of.offsite power occur?

3.

If power was recovered promptly (10 minutes or less), was it due to automatic or manual actions?

4.

Was any voltage increase or decrease experienced just prior to or during the outage?

If so, please give detials, voltages reached, affects, etc.

5.

Was any frequency decay experienced just prior to or during the outage?

If so, please give details, lowest frequency reached, decay rate, affects on equipment operation, etc.

6.

Date of event.

l l