00052 90 $N sv NAFRATIVE SUFCIARY OF PLANT OPEPATIONS i:1_

(0000)

Continued plant shutdown for third refueling outage 4-1 to 4-30 Performed routine surveillances and preventive maintenance items associated with the 1980 refueling l'AJOR ITE*T OF SAFETY-RELATED !!ATUTENANCE 1.

Repaired oil leak on rntor operator for main steam line drain (HV 35069 and IIV 35070).

2.

Repaired main feed control valve on "A" and "B" OTSC.

3.

Installed new M.U. punp L.O.

cooler header outlet isolation valve.

4.

Repaired boric acid addition pump.

5.

Replaced corroded bolting material on "A" and "B" core flood tank outlet check valve.

6.

Replaced corroded bolting material on nitrogen isolation to "B" OTSG.

7.

Replaced missing notor to pur, coupling on "A" diesel generator (LER 80-24).

8.

Inspected Ibin Stean Line "A" af ter water hamner and found no damage.

PERSONNEL CllANGES REQUIRING REPORTING No personnel changes that require reporting in accordance with Technical Specifications Figure 6.9-2 were made in April 1980.

SUdttARY OF CllANGES MADE IN ACCORDANCE L'ITIl 10 CFR 50.59(b) 1.

Modification added that provides ability to circulate water in the pressurizer relief tank.

2.

Design and Technical Specification changes associated with inserting Batch 6 for Cycle 4 of operation.

3.

Provided cable. tray fire stops in all cable trays in the reactor buildin3

~

which can propagate a fire across a fire zone line.

4.

The design which provides power and control to the pressurizer heaters was upgraded in order to enable the operator to control the operation of the heaters when offsite power is not available.

s

~

Page 2 5.

The design which providen normal notive and control power for the Pressurizer PORV PSV-21511 was upgraded in order to enable the operator to control the operation of the PonV uhen offsite power is not available.

6.

The design to provide power and control to the Pressurizer PORY block valve llV 21505 uas up raded in order to enable the operator to control the operation of the valve when offsite power is not available.

7.

Changes made to Rancho Seco Emergency Plan and Iaplementing Procedures (AP.500) resulting from MRC imposed TMI modification.

8.

Modified internal vent valve jack screw lockin3 devic 6.

9.

Spent fuel pool cask loading pit modified to accomplish sipping of as many as two spent fuel assemblies.

10.

Installed and connected circuits to new station service XFMR X43B2, disconnected cablea and bus duct connected to X43B.

"ade mazzanine corridor a channel "A" area.

13.

Added charcoal filter sanple tray in place of a filter in AS42A/B, A536, A500A/B, and AS46.

e 4

e e

%=,

8

REFUELI::C 1:*70PJ%T10:* REQt'IjST anchoSecc$ Unit 1 1.

1: ate of Facility:

July, 1981 2.

Scheduled date f or next refueling shutdown:

September, 1981 Schedu)cd date for restart following refuelin. :

?

3.

Technical Specification change or other if cense anendment required:

4:

Change to Rod Indc>: vs. Power Level Curve (TS 3.5.2) a)

Change to Co c Inbalance vs. Pouer Level Curve (TS 3.5.2) b)

'c) Tilt Limits (TS 3'.5.2) d)' Safety Equipacnt Testing (TS 3.3.3) llay, 1981 Schedu)cd date(s) for submitting proposed licensing action:

5.

None 3rpertant licensing considerations associated with refueling:

6.

7.

Kunber of fuel assc=blios:

a) In the core:

177 151 b) in the Spent Fuel Pool:

579 S.

Present license.'. spent" fuel capacity:

frojected date of the last refucling that can be discharged 9.

1987 to the Spent Fuel Pool:

S e

e e

e 9

e

  • e e

9

AVI. RAGE D tlLY UNIT POWER LEVEL DOCKET NO.

50-312 ancho Seco Unit 1 UNIT

~

April 30, 1980 CO. fPLETED BY. Colombo R

\\

916-452-3211 TELEPlf0NE

^E ' '

310NTil DAY AVERAGE DAll.Y POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (SIWE Neti (stwe. Net) 0 0

1 37 0

2 is 0

0

  • 3 19 0

0 4

20 0

5 2!

0 0

6 22 0

0 7

23 0

8 2-1 0

0 9

25 0

0 10 26 11 0

27 0

0 12 2g 0

13 29 0

30 14 0

l5 3g 0

16 INSTRUCTIONS On this format. list the average J.nly urut p.m er inelin \\!We. Net for each da) in the reportmg month.Compure to the nearest 'whole megawait.

Fif771 e

e OPERATING DATA REPORT 1

DOCKET NO. 50-312 D41E 80-04-30 COMPLETED isy

_R. W. Colo: abo T

TELEPlf0NE 916-4S2 J211 OPERA TING ST t.TUS

1. Unit Name:

Rancho Seco Unit 1 Notes

2. Reporting Period:

April 1980 Continued plant shutdown for

3. Licensed 1hennal Power iMht!:

2772 third refucling outage.

4. Namep!;te Ratin; # Gross Mhel:

963

5. Design Electrical R: ting (Net MWei:

918

6. Maximum Dependable Capacity (Gress MWe):

917

7. Maximum Dependable Capacity (Net MWe):

873

8. If Changes Occur in Capacity Ratings tItems Number 3 Through 7) Since Last Report. Ghe Reasons:

N/A

9. Power Lese! To hhich Restricted,if Anv (Net MWel:

N/A

10. Reasons For Restrictions. If Any:

N/A This Month Yr. to Date Cumulative

11. Ilours in Reporting Period 719 2,903 44,160
12. Number Of !!ours Reactor Was Critica!

0 271 26,344.5

13. Reactor Res:ne Shutdown flours 0

0 3,975.1

14. Ilours Generator Oa Line 0

266.9 za,zuo.z

15. Unit Rewne Shutdown Hours 0

0 1,210.2

16. Gross 1henaal Energy Generated aMWil) 0 689,820 63,673,838
17. Croi> Electrical Energy Generated iMwill 0

221,784 21,506,320 IS. Net Electrical Energy Generated (Mhil,i 0

206,442 20,317,331

19. Unit Senice F:ctor 0

9.2 57.1

30. Unit Asailabi'ity raetor 0

9.2 59.8

21. Unit Csp.iesty Faetot iU>ing MDC Net 1 0

8.1*

52.7

22. Unit Ca; wit.s factor iU.ing DER Net 1 0

7.8 50.1

23. Unit Foreid Outap Rate 0

14.5 Ji~T-

24. Shutdown, Scheduled Oser Nes 6 Months IT pe.Date.and Duratian of Each):

3 N/A

25. If Shut Dawn At End Of Repart Period. Estimated llate of Startup:

Itay 15, 1980

26. Units in Tor Sta'us (Prior to Commereiel Opirations:

Foreca :

Achiesed INITI \\ L CRil!CALITY N/A -

N/A INITI \\l. FI I CI R!rl1 Y N/A-N/A (Oil \\lLRCIAL OP~ R \\ Il0N N/A N/A

  • Correct Item 21 year-to-date for !! arch 1980 Report to read 10.87.

10/771

~

DOCKET NO. 50-11' UNITSHUTDOWNS AND POWEi! REDUCTIONS UNIT N AME R w ho Secr' 1,"it i DATE FO-M "

COM:'LE1 ED ItY P-U- Cr' I t"b

REPORT MON 711 April 1980 416-M->- W11 E

.$ 3 3

4Y5 Licer.sce g t, h

C.mse & Correctise Date c.

,2 g

3~3 Event u?

n.1 Adion to S

j @.

s 3d}

Report :

E0 '

$U Prevent Recurrence o

g C

02, 80-04-01 S

719 C

1 N/A N/A N/A 3rd Refueling Outage commenced January 14, 1980

~

E I

2 3

4 F: Forced Reason:

Method:

Exhibit G. hstructiuns S: Scheduled A Equipment Failure (Explain)

1. Manual for Preparation of Data B. Maintenance of Test
2. Manual Scram.

Entry Sheets for Licensee C.Rcfuelin;;

3. Automatie Scram.

Event Report (LLR) Fife (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)

E 0;3erator Trairiing & License Examination F.Ad:: ini,t rative 5

G.Operati ina' Error (Explain)

Exhibit I Same Source (9/77)

-!!-Other ( E x;)iain)

w. -

. -.