- 05000295/LER-1979-053-03, /03L-0:on 790713,during maint,1L-518 Observed to Have Drifted High by 2.6%.Caused by Instrument Drift.Mechanics Being Trained to Identify Transmitter Drift & Loop Tolerance Tech Spec Change Will Be Submitted + (ML19208A069)
- 05000295/LER-1979-058-03, /03L-0:on 790813,during 50% Power Increase, Feedwater Flow 1FI-520 Read Higher than Other Channel. Caused by Inadequate Calibr Technique.Channel Adjusted & New Tech Specs Changes Will Increase Allowable Drift + (ML19208A070)
- 05000304/LER-1979-038, Forwards LER 79-038/03L-0 + (ML19208A071)
- ML19208A073 + (ML19208A073)
- 05000304/LER-1979-038-03, /03L-0:on 790718,while Performing Periodic Testing,Recirculation Sump to RHR Pump Suction Valve Failed to Stroke Open.Caused by Failure of stem-mounted Limit Switch Interlock Contact on Valve 2MOV-RH8700A to Make Up + (ML19208A074)
- 05000304/LER-1979-043, Forwards LER 79-043/03L-0 + (ML19208A075)
- 05000304/LER-1979-039, Forwards LER 79-039/03L-0 + (ML19208A077)
- 05000304/LER-1979-039-03, /03L-0:on 790723,containment Purge Particulate monitor,2RT-PRO9C Was Taken Out of Svc for Repair.While Monitor Was Out of Svc,Containment Was Vented Once.Caused by Omission in Procedure Re Operable Monitors + (ML19208A079)
- 05000304/LER-1979-043-03, /03L-0:on 790806,during Diesel Generator Loading Test,Engine Failed to Continue Running.Caused by Possible Overspeed Trip Resulting from Low Oil in Governor.Procedure Changed to Check Governor Oil Daily + (ML19208A080)
- 05000325/LER-1979-058, Forwards LER 79-058/03L-0 + (ML19208A081)
- ML19208A082 + (ML19208A082)
- 05000325/LER-1979-058-03, /03L-0:on 790810,during Normal Operation,Core Spray RHR Pump Running Annunciator Energized W/No Pumps Running.Caused by Malfunction of Pressure Switch E-11-PS-No20A,due to Condensation in Switch Assembly + (ML19208A083)
- 05000324/LER-1979-071, Forwards LER 79-071/03L-0 + (ML19208A084)
- ML19208A085 + (ML19208A085)
- 05000219/LER-1979-028, Forwards LER 79-028/03L-0 + (ML19208A086)
- ML19208A087 + (ML19208A087)
- ML19208A088 + (ML19208A088)
- 05000219/LER-1979-028-03, /03L-0:on 790807,during Routine Surveillance of Core Spray Sys 1,parallel Isolation Valve V-20-15 Became Inoperable in Open Position.Caused by High Motor Current Drawn When Close Signal Inadvertently Initiated + (ML19208A089)
- 05000295/LER-1979-042, Forwards LER 79-042/99X-0 + (ML19208A090)
- 05000219/LER-1979-026, Forwards LER 79-026/03L-0 + (ML19208A092)
- ML19208A093 + (ML19208A093)
- 05000295/LER-1979-042-99, /99X-0:on 790523,during Safeguards Logic Testing at 98% Power,Inadvertent Power Trip & Safety Injection Was Initiated.Caused by Operator Error.Operator Was Reinstructed + (ML19208A094)
- 05000219/LER-1979-026-03, /03L-0:on 790807,while Excavating to Repair Equipment Drain Tank Line,Leak in Laundry Tank Discharge Pipe Discovered.Caused by Levels of Mn-54 & Co-60.Line Temporarily Rerouted Until Repairs Made + (ML19208A095)
- 05000324/LER-1979-071-03, /03L-0:on 790808,RHR Sys Pump 2D Vibrated at Level Higher than Allowable Limit During RHR Sys Operational Component Test.Caused by Spring Part Lodged in Vane of Impeller.Part Removed,Pump Inspected & Tested + (ML19208A096)
- 05000338/LER-1979-104, Forwards LER 79-104/01T-0 + (ML19208A097)
- ML19208A098 + (ML19208A098)
- 05000338/LER-1979-104-01, /01T-0:on 790823,feeder Breakers to Several Electrical Penetrations Found Not Set to Protect Penetration Integrity for Range of Faults.Caused by Design Problem + (ML19208A099)
- ML19208A100 + (ML19208A100)
- ML19208A101 + (ML19208A101)
- 05000368/LER-1979-068-03, /03L-0:on 790812,emergency Feedwater Flow Control Valve 2CV-1025-1 from Pump 2P7B to Steam Generator a Failed to Fully Close from Control Room Demand Signal.Caused by Nonalignment of Limit Stop Switch.Switch Realigned + (ML19208A102)
- 05000368/LER-1979-067-04, /04L-0:on 790808,auxiliary Bldg Radwaste Area Radiation Monitor 2RE-E542 Sample Pump Found W/Broken Coupling.Cause Not Stated.Plastic Coupling Replaced W/Metal Coupling.Appropriate Grab Samples Taken + (ML19208A103)
- 05000368/LER-1979-064-03, /03L-0:on 790807,trips in Plant Protection Sys D Placed in Bypass to Investigate Oscillations in delta-T Power Indication.Caused by Cold Leg Temp Indication Oscillation.All Related Signal Connections Tightened + (ML19208A104)
- 05000368/LER-1979-069-03, /03L-0:on 790814,diesel Generator 2 Could Not Be Stopped from Control Room Handswitch 2HS-2829-2 During Mode 2 Operation.Caused by Internal Spring on Handswitch Contact Being Out of Adjustment.Spring & Switch Contacts Adjust + (ML19208A105)
- 05000266/LER-1979-011, Forwards LER 79-011/01T-0 + (ML19208A106)
- ML19208A107 + (ML19208A107)
- 05000266/LER-1979-011-01, /01T-0:on 790804,while Proceeding to Cold Shutdown Condition,Containment Integrity Was Briefly Violated.Caused by Faulty Interlock Allowing Inside Containment Door to Open When Outside Door Was Already Open + (ML19208A108)
- ML19208A109 + (ML19208A109)
- 05000254/LER-1979-024, Forwards LER 79-024/03L-0 + (ML19208A110)
- ML19208A111 + (ML19208A111)
- 05000254/LER-1979-024-03, /03L-0:on 790724,pressure Suppression Chamber Reactor Bldg Vacuum Breaker Pressure Switch Was Found to Actuate Below Limiting Condition for Operation Level.Caused by Instrument Setpoint Drift.Switch Recalibr + (ML19208A112)
- ML19208A113 + (ML19208A113)
- ML19208A114 + (ML19208A114)
- ML19208A116 + (ML19208A116)
- ML19208A117 + (ML19208A117)
- ML19208A119 + (ML19208A119)
- ML19208A121 + (ML19208A121)
- ML19208A123 + (ML19208A123)
- ML19208A124 + (ML19208A124)
- ML19208A136 + (ML19208A136)
- ML19208A137 + (ML19208A137)
- ML19208A139 + (ML19208A139)