ML19208A107

From kanterella
Jump to navigation Jump to search
Forwards LER 79-011/01T-0
Date released: 08/10/2019 Download: ML19208A107


LER 79-011/01T-0:on 790804,while Proceeding to Cold Shutdown Condition,Containment Integrity Was Briefly Violated.Caused by Faulty Interlock Allowing Inside Containment Door to Open When Outside Door Was Already Open
ML19208A108
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 08/14/1979
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19208A108 (2)
Forwards LER 79-011/01T-0
ML19208A106
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 08/14/1979
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19208A106 (1)