Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19207C022 + (ML19207C022)
- 05000321/LER-1979-067, Forwards LER 79-067/03L-0 + (ML19207C023)
- ML19207C024 + (ML19207C024)
- ML19207C025 + (ML19207C025)
- ML19207C026 + (ML19207C026)
- ML19207C027 + (ML19207C027)
- ML19207C028 + (ML19207C028)
- 05000324/LER-1979-066-03, /03L-0:on 790731,while Working on Ref Leg of Torus Level Instrument CAC-LT-3342,CAC-LT-2601 Instrument Drifted Out of tolerance.CAC-LT-2601 Also Malfunctioned.Caused by Air Trapped in Sensing Lines.Instruments Recalibr + (ML19207C029)
- 05000321/LER-1979-067-03, /03L-0:on 790816,noted That Functional Tests for Cable Spreading Room Carbon Dioxide Sys & Control Bldg Corridor Sprinkler Sys Had Not Been Submitted to Plant Review Board.Caused by Omission by Coordinating Engineer + (ML19207C030)
- 05000325/LER-1979-055, Forwards LER 79-055/03L-0 + (ML19207C031)
- ML19207C032 + (ML19207C032)
- ML19207C033 + (ML19207C033)
- ML19207C034 + (ML19207C034)
- ML19207C035 + (ML19207C035)
- 05000325/LER-1979-055-03, /03L-0:on 790805,position on 30-inch Indicator on Rod 34-39 Did Not Indicate.Caused by Problem W/Prototypic Inlet Piping in Drywell.Will Correct During Next Outage of Sufficient Length + (ML19207C036)
- ML19207C037 + (ML19207C037)
- ML19207C039 + (ML19207C039)
- ML19207C040 + (ML19207C040)
- 05000346/LER-1979-088, Forwards LER 79-088/03L-0 + (ML19207C041)
- ML19207C042 + (ML19207C042)
- ML19207C044 + (ML19207C044)
- ML19207C045 + (ML19207C045)
- ML19207C046 + (ML19207C046)
- ML19207C047 + (ML19207C047)
- ML19207C048 + (ML19207C048)
- 05000321/LER-1979-063, Forwards LER 79-063/03L-0 + (ML19207C049)
- ML19207C050 + (ML19207C050)
- ML19207C051 + (ML19207C051)
- ML19207C052 + (ML19207C052)
- ML19207C053 + (ML19207C053)
- 05000346/LER-1979-088-03, /03L-0:on 790807,supply Breaker for Essential Unit Substation Bus F1 Tripped de-energizing Bus.Caused by Electrical Fault in Baat Room Heater,Instituting Operation of Neutral Overcurrent Device + (ML19207C054)
- 05000321/LER-1979-063-03, /03L-0:on 790812,during Cold Shutdown,Rhr Svc Water Pumps Found Incapable of Delivering Rated Flow of 4000 Gpm at 384 Psi.Caused by Normal Wear on Impeller Wear Rings & Bushings.Pumps Rebuilt & Reinstalled + (ML19207C055)
- ML19207C056 + (ML19207C056)
- ML19207C057 + (ML19207C057)
- ML19207C058 + (ML19207C058)
- ML19207C060 + (ML19207C060)
- ML19207C061 + (ML19207C061)
- ML19207C062 + (ML19207C062)
- ML19207C063 + (ML19207C063)
- ML19207C064 + (ML19207C064)
- ML19207C066 + (ML19207C066)
- ML19207C067 + (ML19207C067)
- ML19207C068 + (ML19207C068)
- ML19207C069 + (ML19207C069)
- ML19207C070 + (ML19207C070)
- ML19207C071 + (ML19207C071)
- 05000338/LER-1979-092, Forwards LER 79-092/03L-0 + (ML19207C072)
- ML19207C073 + (ML19207C073)
- ML19207C074 + (ML19207C074)
- ML19207C075 + (ML19207C075)
- ML19207C076 + (ML19207C076)