ML19207C037

From kanterella
Jump to navigation Jump to search
Comments on Re Us Steel Spark Test Procedure & Testing Personnel Qualification Records.Both Procedures & Personnel Qualifications Are Adequate
ML19207C037
Person / Time
Issue date: 08/02/1979
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: George H
CHEMETRON CORP.
Shared Package
ML19207C038 List:
References
REF-QA-99900028 NUDOCS 7909060356
Download: ML19207C037 (1)


Text

  • f

/pn MGu

=

'o

~ ', -

UNITED STATES

! yp, j

NUCLEAR REGULATORY COMMISSION REGION IV

.7)

Lj O.,

g 611 RY AN PLAZA C RIVE, SUITE 1000

[

ARLINGTON, TEXAS 76012 2 AUG iS79 Docket No. 99900028/79-01 Tube Tums Division of Chemetron Corp.

Attn: Mr. H. H. George Vice President of Engineering 2900 W. Broadway P. O. Box 987 Louisville, Kentucky 40201

Dear Sir:

With reference to your letter dated July 13, 1979, with the attached U. S. Steel's Spark Testing Procedure and testing personnel qualifica-tions records, we have the following comments.

Both the procedure and the testing personnel qualifications appear adequate to identify the incorrect materia! with 0.44% carben, from the correct material with 0.22% carbon. Notwithstanding the adequacy of the procedure and test personnel, the decision to use this method of separaticn of correct from incorrect materials remains Tube Tums' responsibility.

Sincerely,,

bdl hw Uldis Potapovs, Chie Vendor Inspection Branch cc: File Mr. W. T. Wakefield QA Consultant

3. D h}.i 7 7909060 ]-["6