Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18102B185 + (ML18102B185)
- ML18102B192 + (ML18102B192)
- ML18102B202 + (ML18102B202)
- ML18102B203 + (ML18102B203)
- ML18102B209 + (ML18102B209)
- ML18102B212 + (ML18102B212)
- RS-18-041, Response to Request for Additional Information Regarding Request for Relief (I4R-07) for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened . + (ML18102B213)
- ML18102B220 + (ML18102B220)
- ML18102B221 + (ML18102B221)
- ML18102B223 + (ML18102B223)
- ML18102B225 + (ML18102B225)
- PMNS20180328, Pre-Subsequent License Renewal Application Meeting - Safety + (ML18102B233)
- ML18102B234 + (ML18102B234)
- ML18102B235 + (ML18102B235)
- ML18102B236 + (ML18102B236)
- GO2-18-047, Registration of Spent Fuel Cask Use + (ML18102B242)
- PMNS20180480, Clarification of AMP Changes for Seabrook License Renewal + (ML18102B244)
- BVY 18-012, Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3), 10CFR71.106 and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G + (ML18102B249)
- ML18102B250 + (ML18102B250)
- LR-N970273, Submits Suppl to 970131 & 0314 Applications for Amends to Licenses DPR-70 & DPR-75,revising TS on Pressurizer Power Operated Relief Valves.Suppl Issued to State That Conclusion of NSHC Remains Valid + (ML18102B251)
- ML18102B252 + (ML18102B252)
- ML18102B255 + (ML18102B255)
- ML18102B256 + (ML18102B256)
- LR-N970271, Provides 30 Day Response to GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations. Written Response Items 1 & 2 of Requested Info Section Will Be Provided by 970730 + (ML18102B257)
- ML18102B258 + (ML18102B258)
- ML18102B259 + (ML18102B259)
- ML18102B260 + (ML18102B260)
- LR-N970269, Suppl Info to Util 970211 Application for Amends to Licenses DPR-70 & DPR-75,revising TS for Chilled Water Sys - Auxiliary Bldg Subsystem.Ref to Radiation Monitoring Signal Removed from Bases Section + (ML18102B261)
- ML18102B262 + (ML18102B262)
- ML18102B263 + (ML18102B263)
- ML18102B265 + (ML18102B265)
- ML18102B267 + (ML18102B267)
- ML18102B269 + (ML18102B269)
- ML18102B272 + (ML18102B272)
- ML18102B275 + (ML18102B275)
- ML18102B277 + (ML18102B277)
- ML18102B278 + (ML18102B278)
- 05000311/LER-1997-004-02, :on 970408,failed to Comply W/Ts Action Statement,Dg Start & Inadequate Surveillance Testing Due to Inadequate Tracking of Inoperable Equipment by Shift Personnel.Procedures Were Revised + (ML18102B280)
- 05000311/LER-1997-006-02, :on 970404,seismic Adequacy of Svc Water Header Was Invalidated Due to Unclear Work Instructions.Piping Has Been Reinstalled Correctly + (ML18102B281)
- LR-N970299, Requests That Restart Assessment Team Insp Commence During Preceding Wk of 970608 + (ML18102B283)
- ML18102B284 + (ML18102B284)
- ML18102B287 + (ML18102B287)
- LR-N970297, Notifies NRC of Commitment Rev Re Installation of Two Multipoint Recorders Supplied by Leads & Northrup, Including Backup CET Displays Into EOPs.NUREG-0737 II.F.2 Required Use of CET Temp in EOPs as Listed + (ML18102B290)
- 05000272/LER-1996-038, :on 961210,switchgear Penetration Area Ventilation Could Not Maintain Design Temps.Caused Because Switchgear Penetration Area Ventilation Sys Failure Modes Not Properly Established.Room Temp Monitored + (ML18102B291)
- IR 05000311/1996081 + (ML18102B292)
- ML18102B295 + (ML18102B295)
- LR-N970298, Forwards Description of Proposed TS Changes Identified by Pse&G Which Do Not Impact Restart or Operation of Units + (ML18102B298)
- LR-N970234, Forwards Description of Scope,Methodology & Schedule for Design/Licensing Bases Review Project + (ML18102B299)
- ML18102B304 + (ML18102B304)
- ML18102B305 + (ML18102B305)
- ML18102B306 + (ML18102B306)