Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18040A263 + (ML18040A263)
- IR 05000410/1997002 + (ML18040A264)
- ML18040A264 + (ML18040A264)
- L-2018-042, Snubber Program Plan Submittal for Fifth 10-Year Inservice Testing Interval + (ML18040A267)
- ML18040A280 + (ML18040A280)
- ML18040A282 + (ML18040A282)
- 05000410/LER-1993-010, :on 931108,HPCS Was Inoperable Due to Equipment Deficiency,Inadequate Managerial Methods & Poor Work Practices.Replaced Deficient Contactors & Restored Tap Setting.Also Reportable Per Part 21 + (ML18040A285)
- ML18040A292 + (ML18040A292)
- ML18040A294 + (ML18040A294)
- ML18040A296 + (ML18040A296)
- ML18040A297 + (ML18040A297)
- ML18040A299 + (ML18040A299)
- LR-N18-0022, License Amendment Request to Revise Technical Specification Actions for Rod Position Indicators + (ML18040A301)
- ML18040A305 + (ML18040A305)
- ML18040A309 + (ML18040A309)
- ML18040A311 + (ML18040A311)
- ML18040A312 + (ML18040A312)
- ML18040A314 + (ML18040A314)
- ML18040A316 + (ML18040A316)
- ML18040A317 + (ML18040A317)
- LR-N18-0021, Supplemental Information to License Amendment Request for Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System Instrumentation and Engineered Safety Feature Actuation System Instrumentation Test Times and Completion Times + (ML18040A319)
- ML18040A321 + (ML18040A321)
- ML18040A322 + (ML18040A322)
- ML18040A325 + (ML18040A325)
- ML18040A327 + (ML18040A327)
- ML18040A329 + (ML18040A329)
- ML18040A330 + (ML18040A330)
- ML18040A331 + (ML18040A331)
- ML18040A332 + (ML18040A332)
- ML18040A335 + (ML18040A335)
- ML18040A338 + (ML18040A338)
- ML18040A339 + (ML18040A339)
- ML18040A342 + (ML18040A342)
- ML18040A343 + (ML18040A343)
- 05000410/LER-1998-004, :on 980302,TS Required LSFT of Level 8 Trip of Main Turbine Was Missed.Caused by Knowledge Deficiency of EHC Sys.Revised Applicable LSFT Procedures Prior to Refueling Outage 6 + (ML18040A345)
- ML18040A346 + (ML18040A346)
- 05000410/LER-1998-017, :on 980602,control Room Ventilation Sys Was Declared Inoperable.Caused by Original Design Deficiency. Mod Designed,Tested & Implemented Prior to Startup from RF06 to Correct Design Deficiency + (ML18040A349)
- ML18040A350 + (ML18040A350)
- ML18040A357 + (ML18040A357)
- ML18040A359 + (ML18040A359)
- ML18040A360 + (ML18040A360)
- ML18040A362 + (ML18040A362)
- ML18040A364 + (ML18040A364)
- ML18040A365 + (ML18040A365)
- ML18040A366 + (ML18040A366)
- ML18040A369 + (ML18040A369)
- ML18040A370 + (ML18040A370)
- ML18040A373 + (ML18040A373)
- ML18040A386 + (ML18040A386)
- ML18040A434 + (ML18040A434)
- ML18040A436 + (ML18040A436)