ML18040A332

From kanterella
Jump to navigation Jump to search
Forwards Revised EPIPs Including Rev 7 to EPIP-EPP-01, Classification of Emergency Conditons at Unit 1, Rev 7 to EPIP-EPP-02, Classification of Emergency Conditions,Unit 2 & Rev 7 to EPIP-EPP-08, Offsite DA & PAR (Cover Pps Only)
ML18040A332
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 04/06/1998
From: Terry C
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18040A333 List:
References
NUDOCS 9804140300
Download: ML18040A332 (10)


Text

i, TT CATEGORY 1 REGULAT INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESS10N NBR:9804140300 DOC.DATE: 98/04/06 NOTARIZED: NO FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara Powe 05000220 DOCKET I

, 50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara Moha 0500 410 AUTH .'NAME AUTHOR AFFILIATION A TERRY,C.D. Niagara Mohawk Power Corp. epvr5 RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) f/Q

SUBJECT:

Forwards revised EPIPs including rev 7 to EPIP-EPP-01, "Classification of Emergency Conditons at Unit 1," rev 7 to EPIP-EPP-02, "Classification of Emergency Conditions, Unit 2"

&. rev 7 to EPIP-EPP-08, Offsite DA & PAR" (Cover pps only).

DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR L ENCL i TITLE: OR Submittal: Emergency Preparedness Plans, Implement'g Procedures, SIZE:

CE NOTES:

RECIPIENT COPIES RECIPIENT COPIE ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 PD1-1 LA 1 1 PD1-1 PD 1 1 HOOD,D 1 1 INTERNAL: AEOD/HAGAN,D 1 1 CENTER OP 2 2 NRR/DRPM/PERB 1 1 NUDOCS-ABSTRACT 1 1 EXTERNAL: NOAC 1 1 NRC PDR D

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRZBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

0 I

NIACARA MOHAWK G E N E RAT I 0 N NINE MILE POINT NUCLEAR STATION/LAKEROAD, P.o. BOX 63, LYCOMING, NEW YORK 13093/TELEPMONE (315) 349-7263 FAX (315) 349-4753 BUSINESS GROUP CARL D. TERRY April 6, 1998 Vice President Nuctear Safety Assessment and Support United States Nuclear Regulatory Commission file code.'98-EP-013 A%I'N: Document Control Desk Washington, DC 20555 RE: Nine Mile Point Unit 1 Nine Mile Point Unit 2 Docket No. 50-220 Docket No. 50-410 DPR-63 NPF-69 Gentlemen:

Enclosed please find copies of the following Emergency procedures for Niagara Mohawk Power Corporation's Nine Mile Point Nuclear Station:

~ EPIP-EPP-01, Revision 07, "Classification of Emergency Conditions at Unit 1" (Cover Page only)

~ EPIP-EPP-02, Revision 07, "Classification of Emergency Conditions at Unit 2" (Cover Page only)

~ EPIP-EPP-08, Revision 07, "Offsite Dose Assessment and Protective Action Recommendation" (Cover Page only)

These procedures are being submitted as required by Section V to Appendix E of 10 CFR Part 50. Should you have any questions, please feel free to contact Mr. James D. Jones, Director of Emergency Preparedness at (315) 349-4486.

Very Truly Yours, Carl D. Te, (I/'ice President Nuclear Safety Assessment and Support

/ksj Enclosure g~gt7 Mr. H.J. Miller, Regional Administrator, Region'I (2 copies)'r.

B.Sr Norris, Senior Resident Inspector (1 copy)

Mr. D.S. Hood, Senior Project Manager, NRR (1 copy)

Records Management 9804140300 980406 PDR ADOCK 05000220 F PDR

I . ~

~1 Po <<'4v. ~ ~ c.-' ~ ~

0 F W

.' p I, v we ave fe e

~ 4> 4 E lt qr v I

NIAGARA MOHAWK POWER CORPORATION HIHE MILE POIHT NUCLEAR STATION EMERGE:ICY Ei ?LAH Ii IPLEMEHTIilG PROCEDURE P P-~PP-0 R~'llSlON 07 Cl OSSIFICATION OF PIERGDC'f CONDITIONS .AT UNIT I TEC,'",'HICAL SPECIFICATIOH REOUIR<0 I

Approved by:

H. L. Rademacner Plant Ma ager - Unit I THIS IS A FULL R 'SIOH Effective Gate: 06/26/97 PERIOOIC REYI i DUE DATE

~ ~ k NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE EP IP-EPP-0 REVISION 07 CLASSIFICATION OF EMERGENCY CONDITIONS AT UNIT 2 TECHNICAL SPECIFICATION RE(VIREO Approved by:

J. T. Conway Plan Manager - Un'zz Date THIS IS A FULL REVISION Effecti ve Date: 06/26/9'7 PERIODIC REVIEW DUE DATE >ERR<<>> i<<~

4 o r I> ~ E

NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE PIP-EPP-08 R VISION 07 OFF-SITE 00SE ASSESSMENT AND PROTECTIVE ACTION RECOMMENDATION TECHNICAL SPECIFICATION RE(UIRED Approved By:

N. L. Rademacher Plant Manager - Unit I Da Approved By:

J. T. Conway P t Manager - Unit Da e THIS IS A FULL REVISION Effective Date:

PERIODIC REVIEW DUE DATE: