Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000259/1999004 + (ML18039A860)
- ML18039A862 + (ML18039A862)
- ML18039A864 + (ML18039A864)
- ML18039A872 + (ML18039A872)
- ML18039A873 + (ML18039A873)
- 05000296/LER-1999-005-02, :on 990901,SR for Standby Liquid Control Sampling Was Not Met.Caused by Deficient Procedure for Chemical Addition to Standby Liquid Control.Revised Procedure.With + (ML18039A875)
- ML18039A878 + (ML18039A878)
- ML18039A879 + (ML18039A879)
- ML18039A881 + (ML18039A881)
- ML18039A882 + (ML18039A882)
- ML18039A885 + (ML18039A885)
- ML18039A887 + (ML18039A887)
- ML18039A888 + (ML18039A888)
- ML18039A892 + (ML18039A892)
- L-2016-003, Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Sig. Hazards Consideration Determination, and Opportunity for Hearing (CAC Nos. MF8912-13; EPID L-2016-0034) + (ML18039A892)
- ML18039A894 + (ML18039A894)
- 05000260/LER-1999-008, :on 990905,HPCI Was Inoperable Due to Failed Flow Controller.Caused by Premature Failure of Capacitor 2C3.Replaced Controller & HPCI Sys Was Run IAW Sys Operating Instructions + (ML18039A895)
- ML18039A897 + (ML18039A897)
- 05000260/LER-1999-009, :on 990915,manual Reactor Scram Was Noted Due to EHC Leak.Caused by Failure of Stainles Steel Tubing Connection.Removed Damaged Tubing & Connection Plug + (ML18039A898)
- ML18039A901 + (ML18039A901)
- ML18039A903 + (ML18039A903)
- 05000260/LER-1999-010, :on 990917,automatic Reactor Scram on Turbine Stop Valve Closure Occurred.Caused by High Water Level in Main Steam Moisture Separator 2C2.Unit 2C2 Reservoir Level Transmitter & Relays Were Replaced & Tested Satisfactorily + (ML18039A904)
- ML18039A905 + (ML18039A905)
- ML18039A907 + (ML18039A907)
- ML18039A910 + (ML18039A910)
- ML18039A912 + (ML18039A912)
- ML18039A913 + (ML18039A913)
- ML18039A915 + (ML18039A915)
- ML18039A916 + (ML18039A916)
- BYRON 2017-0057, 2017 Byron Station Initial License Examination Letter Submitting Outline + (ML18039A916)
- ML18039A920 + (ML18039A920)
- ML18039A927 + (ML18039A927)
- ML18039A928 + (ML18039A928)
- ML18039A929 + (ML18039A929)
- ML18039A932 + (ML18039A932)
- ML18039A933 + (ML18039A933)
- STC-18-010, Results of the Annual Count of Active Radioactive Material Licenses in the National Materials Program + (ML18039A934)
- ML18039A936 + (ML18039A936)
- ML18039A937 + (ML18039A937)
- ML18039A939 + (ML18039A939)
- IR 05000445/2017007 + (ML18039A943)
- ML18039A945 + (ML18039A945)
- ML18039A947 + (ML18039A947)
- ML18039A949 + (ML18039A949)
- ML18039A950 + (ML18039A950)
- ML18039A962 + (ML18039A962)
- ML18039A972 + (ML18039A972)
- IR 05000263/1995001 + (ML18039A974)
- ML18039A979 + (ML18039A979)
- ML18039A985 + (ML18039A985)
- PNO-II-97-023B, on 970422,extended Shutdown for Oconee Units 2 & 3,update Made.Currently,Licensee Developing Justification for Continued Operation of Unit 1 Based on Different Designed Thermal Sleeves Installed in Unit 1 + (ML18040A002)