Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18039A598 + (ML18039A598)
- ML18039A600 + (ML18039A600)
- IR 05000259/1998006 + (ML18039A601)
- ML18039A602 + (ML18039A602)
- 05000296/LER-1998-004-01, :on 981007,primary Containment Allowable Leak Rate Was Exceeded.Caused by Failure of Check Valve to Fully Seat Following Shutdown of Rbbccw Sys for Llrt.Valve Was Retested During Next Refueling Outage.With + (ML18039A603)
- PMNS20180139, Design Certification Review Discussions + (ML18039A604)
- ML18039A605 + (ML18039A605)
- 05000296/LER-1998-005, :on 981014,mode Changes Not Allowed by TS 3.0.4 Were Made During Reactor Startup.Caused by TS LCO 3.0.4 Not Being Properly Applied.Training Info Memo Re Proper Application for TS LCO 3.0.4 Was Prepared.With + (ML18039A607)
- ML18039A608 + (ML18039A608)
- ML18039A609 + (ML18039A609)
- ML18039A610 + (ML18039A610)
- ML18039A611 + (ML18039A611)
- NOC-AE-18003550, Evidence of Financial Protection + (ML18039A612)
- ML18039A612 + (ML18039A612)
- ML18039A615 + (ML18039A615)
- ML18039A616 + (ML18039A616)
- ML18039A618 + (ML18039A618)
- ML18039A619 + (ML18039A619)
- ML18039A620 + (ML18039A620)
- ML18039A621 + (ML18039A621)
- ML18039A622 + (ML18039A622)
- ML18039A623 + (ML18039A623)
- ML18039A624 + (ML18039A624)
- ML18039A625 + (ML18039A625)
- ML18039A626 + (ML18039A626)
- ML18039A627 + (ML18039A627)
- ML18039A632 + (ML18039A632)
- ML18039A634 + (ML18039A634)
- ML18039A636 + (ML18039A636)
- 05000296/LER-1998-006, :on 981116,MSSR Valves Exceeded TS Setpoint Tolerance.Caused by Pilot Valve Disc/Seat Bonding. Installed SRV Pressure Switches During Unit 3,cycle 8 Outage.With + (ML18039A637)
- ML18039A638 + (ML18039A638)
- ML18039A641 + (ML18039A641)
- ML18039A643 + (ML18039A643)
- ML18039A644 + (ML18039A644)
- ML18039A646 + (ML18039A646)
- 05000296/LER-1998-007, :on 981116,unplanned ESF Following Loss of 4kV Unit Board 3B Occurred.Caused by Temporary Energization of Lockout Relay on 4kV Unit Board 3B When Resistor on Relay Monitoring Lamp Circuit Shorted.Replaced Resistor + (ML18039A647)
- ML18039A648 + (ML18039A648)
- ML18039A649 + (ML18039A649)
- ML18039A652 + (ML18039A652)
- ML18039A653 + (ML18039A653)
- IR 05000259/1998007 + (ML18039A654)
- ML18039A658 + (ML18039A658)
- ML18039A659 + (ML18039A659)
- ML18039A660 + (ML18039A660)
- ML18039A661 + (ML18039A661)
- ML18039A662 + (ML18039A662)
- ML18039A664 + (ML18039A664)
- ML18039A665 + (ML18039A665)
- ML18039A666 + (ML18039A666)
- 05000260/LER-1998-004-03, :on 981202,SR Intent Was Not Adequately Implemented.Caused by Procedural Inadequacy.Revised Procedures to Provide Proper SR Implementation.With + (ML18039A667)
- ML18039A671 + (ML18039A671)