Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18024B384 + (ML18024B384)
- ML18024B385 + (ML18024B385)
- IR 05000259/1979034 + (ML18024B386)
- 05000260/LER-1980-007, Forwards LER 80-007/03L-0 + (ML18024B387)
- ML18024B388 + (ML18024B388)
- 05000260/LER-1980-007-03, /03L-0:on 800203,during Normal Operation,Reactor Recirculation Pump 2B Tripped.Caused by Pickup of Recirculation Motor Generator Set Generator Stator Temp Relay.Tests Run,No Problems Found + (ML18024B389)
- 05000260/LER-1980-006, Forwards LER 80-006/03L-0 + (ML18024B390)
- ML18024B391 + (ML18024B391)
- 05000260/LER-1980-006-03, /03L-0:on 800203,while Running Electrical Checks on Recirculation Pump,Reactor Recirculation Pump 2A Was Accidentally Tripped.Caused by Misinterpretation of Labels on Recirculation Pump Trip Breakers + (ML18024B392)
- 05000260/LER-1980-008, Forwards LER 80-008/03L-0 + (ML18024B394)
- ML18024B395 + (ML18024B395)
- 05000296/LER-1980-005, Forwards LER 80-005/03L-0 + (ML18024B396)
- ML18024B397 + (ML18024B397)
- 05000296/LER-1980-005-03, /03L-0:on 800205,during Normal Operation,Fcv 74-73 Found Inoperable While Performing Surveillance Instruction. Caused by Random Failure of Gear Tooth in Limit Switch,Size SMB-2,Model 3-G.Limit Switch Replaced + (ML18024B398)
- 05000260/LER-1980-008-31, /03L-0:on 800206,while Conducting Automatic Depressurization Sys Logic Functional Test,Relay 10A-K26 Manually Operated in Place of Relay 2E-K26 Causing Recirculation Pump 2B Trip.Caused by Operator Error + (ML18024B399)
- ML18024B400 + (ML18024B400)
- ML18024B401 + (ML18024B401)
- 05000296/LER-1980-006, Forwards LER 80-006/03L-0 + (ML18024B402)
- ML18024B403 + (ML18024B403)
- 05000296/LER-1980-006-03, /03L-0:on 800217,w/unit at Steady State Operation, Emergency Equipment Cooling Water Flow Did Not Meet Min Flow of 4 Gpm.Caused by Shells & Mud Preventing Adequate Flow Through Residual Heat Removal Pump 3B Seal Cooler Valve + (ML18024B404)
- ML18024B405 + (ML18024B405)
- IR 05000259/1979039 + (ML18024B407)
- ML18024B408 + (ML18024B408)
- IR 05000259/1980001 + (ML18024B410)
- ML18024B421 + (ML18024B421)
- ML18024B425 + (ML18024B425)
- ML18024B429 + (ML18024B429)
- ML18024B430 + (ML18024B430)
- ML18024B431 + (ML18024B431)
- ML18024B432 + (ML18024B432)
- IR 05000259/1979037 + (ML18024B433)
- ML18024B434 + (ML18024B434)
- IR 05000259/1980002 + (ML18024B436)
- 05000260/LER-1980-012, Forwards LER 80-012/03L-0 + (ML18024B437)
- ML18024B438 + (ML18024B438)
- 05000260/LER-1980-012-03, /03L-0:on 800223,while in Cold Shutdown for HPCI Turbine Bearing Support Pedestal Repairs,Unit Was Unable to Return to Svc.Caused by Out of Svc Condition of Hpci.Repairs Completed & Unit Returned to Svc + (ML18024B439)
- 05000296/LER-1980-007, Forwards LER 80-007/03L-0 + (ML18024B440)
- ML18024B441 + (ML18024B441)
- 05000296/LER-1980-007-03, /03L-0:on 800301,after Offsite Power Was Restored to 4-kV Bus Tie Board,Short Period of Time Elapsed Before Reclosure of Bus Tie Boarder Feeder Breaker.Apparent Disagreement in Time Is Still Being Investigated + (ML18024B442)
- 05000260/LER-1980-013, Forwards LER 80-013/03L-0 + (ML18024B443)
- ML18024B444 + (ML18024B444)
- 05000260/LER-1980-013-03, /03L-0:on 800301,during Preparations for Startup After Outage for Maint,Offsite 161-kV Power Source Intermittently Lost Power.Caused by Winter Storm.Icing & Wind Effects Under Investigation + (ML18024B445)
- ML18024B446 + (ML18024B446)
- ML18024B448 + (ML18024B448)
- ML18024B449 + (ML18024B449)
- ML18024B450 + (ML18024B450)
- IR 05000259/1979038 + (ML18024B451)
- ML18024B453 + (ML18024B453)
- ML18024B455 + (ML18024B455)
- ML18024B456 + (ML18024B456)
- ML18024B457 + (ML18024B457)