Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18016B114 + (ML18016B114)
- ML18016B115 + (ML18016B115)
- ML18016B117 + (ML18016B117)
- ML18016B118 + (ML18016B118)
- ML18016B119 + (ML18016B119)
- ML18016B120 + (ML18016B120)
- ML18016B121 + (ML18016B121)
- ML18016B122 + (ML18016B122)
- FOIA/PA-2018-0056 + (ML18017A004)
- ML18017A006 + (ML18017A006)
- ML18017A007 + (ML18017A007)
- ML18017A008 + (ML18017A008)
- ML18017A009 + (ML18017A009)
- ML18017A010 + (ML18017A010)
- ML18017A011 + (ML18017A011)
- ML18017A013 + (ML18017A013)
- ML18017A014 + (ML18017A014)
- ML18017A015 + (ML18017A015)
- ML18017A016 + (ML18017A016)
- ML18017A017 + (ML18017A017)
- ML18017A018 + (ML18017A018)
- ML18017A021 + (ML18017A021)
- ML18017A022 + (ML18017A022)
- ML18017A023 + (ML18017A023)
- ML18017A024 + (ML18017A024)
- ML18017A026 + (ML18017A026)
- ML18017A027 + (ML18017A027)
- PLA-1846, Advises That Simultaneous Malfunctions of Control Sys Due to Single High Energy Line Break Bounded by FSAR Chapter 15 Analysis & within Operators & Safety Sys Abilities to Mitigate Events + (ML18017A029)
- ML18017A036 + (ML18017A036)
- 05000388/LER-1991-010, :on 910628,RWCU Isolated on Two Occassions Due to Actuations of Steam Leak Detection Instrumentation. Caused by Design Deficiency & Elevated Ambient Penetration Room Temps.Temp Modules Replaced + (ML18017A039)
- PLA-3895, Provides Understanding That as Long as Licensees Retain Documented Technical Adequacy Evaluations of Deviations,W/ Respect to Deviation from Rev 4 of BWROG Epgs,Nrc Approval Prior to Implementation Not Required,In Ref to + (ML18017A041)
- ML18017A042 + (ML18017A042)
- ML18017A044 + (ML18017A044)
- ML18017A045 + (ML18017A045)
- 05000388/LER-1995-008-01, :on 950609,shift Average Licensed Core Thermal Power Was Exceeded.Caused by Failed Instrumentation Drift. Repaired & Recalibrated Subject Instrumentation + (ML18017A046)
- PLA-4334, Documents Response to Verbal Questions from NRC on Util Move of EOF to Northeast Division Headquarters + (ML18017A047)
- ML18017A048 + (ML18017A048)
- ML18017A049 + (ML18017A049)
- ML18017A050 + (ML18017A050)
- PLA-4395, Monthly Operating Repts for Nov 1995 for SSES Units 1 & 2 + (ML18017A051)
- ML18017A053 + (ML18017A053)
- OIG-13-A-02, Status of Recommendations: Audit of NRCs Process for Calculating License Fees, Dated January 17, 2018 + (ML18017A056)
- ML18017A061 + (ML18017A061)
- ML18017A062 + (ML18017A062)
- ML18017A063 + (ML18017A063)
- ML18017A065 + (ML18017A065)
- ML18017A066 + (ML18017A066)
- ML18017A068 + (ML18017A068)
- ML18017A069 + (ML18017A069)
- ML18017A074 + (ML18017A074)
- ML18017A077 + (ML18017A077)