April 10, 1995 Mr. Robert G.
Byram Senior'ice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, PA'8101 (I
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION (RAI) CONCERNING ANALYSIS SUPPORTING'PENNSYLVANIA POWER
& LIGHT COHPANY (PP&L) DEVIATIONS FROM THE, BWR OWNERS GROUP (BWROG)
EMERGENCY PROCEDURES GUIDELINES (EPGS)
REVISION 4 FOR, SUSQUEHANNA STEAM ELECTRIC STATION (SSES),
UNITS 1
AND 2 (TAC NOS.
M91691 'AND H91692)
Dear Hr. Byram:
Pennsylvania Power and NRR staff met in Rockville, Maryland, on Thursday, March 30, 1995, to discuss PP&L's report NE-92-01, "Technical Basis for PP&L's Approach to ATWS Procedural Guidance."
During the meeting, the staff indicated that it would send to PP&L a limited set of questions regarding the analysis discussed in that report.
Accordingly, I have attached them to this letter.
Please provide a response not later than the end of April.
This information will help the staff to prepare for the upcoming meeting with the Advisory Committee on Reacto}
Safeguards to be held in Hay on the subject of EPGs.
The requirement affects nine or fewer respondents and, therefore, is not subject to the Office of Management and Budget review under P.L.96-511.
Sincerely,
/S/
Chester
- Poslusny, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-387/388
Enclosure:
RAI cc w/encl:
See next page DISTRIBUTION Docket Fi 1 e, PUBLIC PDI-2 Reading SVarga JZwolinski JStolz OFFICE PDI-2 L
NAME MO'Brie DATE
<~ 95 CPoslusny HO'Brien OGC ACRS(4)
- JWhite, R M;j RJones PDI-2 P
CPoslusn
- rb
'lO 95 RXB
>fIzc.gP t9 95 P
D 95 OFFICIAL RECORD COPY DOCUMENT NAME:
SU91691.RAI
'504i40171'750410 PDR ADOCK 05000387 P
PDR g(g
0 0
I
,.,Ago~)p s
ggR 8500 Wp0 Cy n
'g
++**+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 205554001 April 10, 1995 Mr. Robert G.
Byram Senior Vice President-Nuclear
'ennsylvania Power and Light Company 2 North Ninth Street Allentown, PA 18101
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION (RAI) CONCERNING ANALYSIS SUPPORTING PENNSYLVANIA POWER 5 LIGHT COMPANY (PPKL) DEVIATIONS FROM THE BWR OWNERS GROUP (BWROG)
EHERGENCY PROCEDURES GUIDELINES (EPGS)
REVISION 4 FOR SUSQUEHANNA STEAM ELECTRIC STATION (SSES),
UNITS 1
AND 2 (TAC NOS.
H91691 AND M91692)
Dear Mr. Byram:
Pennsylvania Power and NRR staff met in Rockville, Maryland, on Thursday, March 30, 1995, to discuss PPBL's report NE-92-01, "Technical Basis for PP&L's Approach to ATWS Procedural Guidance."
During the meeting, the staff indicated that it would send to PPKL a limited set of questions regarding the analysis discussed in that report.
Accordingly, I have attached them to this letter.
Please provide a response not later than the end of April.
This information will help the staff to prepare for the upcoming meeting with the Advisory Committee on Reactor Safeguards to be held in May on the subject of EPGs.
The requirement affects nine or fewer respondents and, therefore, is not subject to the Office of Hanagement and Budget review under P.L.96-511.
Sincerely, Docket Nos. 50-387/388
Enclosure:
RAI cc w/encl:
See next page Chester
- Poslusny, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
I~
Mr. Robert G.
Byram Pennsylvania Power
& Light Company Susquehanna Steam Electric Station, Units 1
& 2 CC:
~
Jay Silberg, Esq.
- Shaw, Pittman, Potts
& Trowbridge 2300 N Street N.W.
Washington, D.C.
20037 Bryan A. Snapp, Esq.
Assistant Corporate Counsel Pennsylvania Power
& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. J.
M. Kenny Licensing Group Supervisor Pennsylvania Power
& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mrs. Maitri Banerjee Senior Resident Inspector U. S. Nuclear Regulatory Commission P.O.
Box 35 Berwick, Pennsylvania 18603-0035 Mr. William P. Dornsife, Director Bureau of Radiation Protection Pennsylvania Department of Environmental Resources P.
O.
Box 8469 Harrisburg, Pennsylvania 17105-8469 Mr. Jesse C. Tilton, III Allegheny Elec. Cooperative, Inc.
212 Locust Street P.O.
Box 1266 Harrisburg, Pennsylvania 17108-1266 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Mr. Harold G. Stanley Vice President-Nuclear Operations Susquehanna Steam Electric Station Pennsylvania Power and Light Company Box 467 Berwick, Pennsylvania 18603 Mr. Herbert D. Woodeshick Special Office of the President:-
Pennsylvania Power and Light Company ~
Rural Route 1,
Box 1797 Berwick, Pennsylvania 18603 1)
George T. Jones Vice President-Nuclear Engineering Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Chairman Board of Supervisors 738 East Third Street
- Berwick, PA 18603
~
~
RE U ST FOR ADDITIONAL INFORMATION CONC RN G AN SIS SUPPORTING D V AT 0 FROM BWROG EPGS R
V 4 (1)
What is the time required to inject the hot shutdown boron weight (HSBW) at Susquehanna2 Please provide the following data:
(a)
Target boron concentration in ppm (e.g.,
495 ppm hot)
(b)
Volume to be borated (c)
Injectipn rate (d)
Time to inject HSBW (2)
Provide data from SABRE runs for an MSIV closure ATWS with SLC at different water levels.
The data that we are looking for is:
(a)
Power, flow, water level, and in-core boron concentration versus time (b)
Time to reach the stagnation flow (c)
Suppression pool temperature (3)
Provide data for a run similar to the one documented in figures 2.1.2.4-1 of the old 1992 document (NE-92-001) - Water level at TAF with large power oscillations attributed to SRV cycling, or provide any other data.
which shows that the large power oscillations are no longer observed with level at TAF using the improve models in SABRE.
(4)
Describe the PPSL specific deviations from the standard BWROG EPG's.
Ignore this question if the October 1992 letter is still your position on deviations.
Enclosure