Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- HNP-97-217, Requests Relief from Criteria of 10CFR50.55a(g)(6)(ii)(A)(2) for Augmented Exams of RPV Welds at Plant.Relief Requested from Listed ASME B&PV Code,Section Xi,Requirements for Final Insp Period of First 20 Year Insp Interval + (ML18016A260)
- ML18016A262 + (ML18016A262)
- ML18016A263 + (ML18016A263)
- 05000400/LER-1997-024, :on 971118,SSPS Testing Deficiency Was Noted. Caused by Inadequate Testing Scheme Provided by Ssps Vendor. Revised Procedure + (ML18016A264)
- HNP-97-219, Monthly Operating Rept for Nov 1997 for Shearon Harris Nuclear Power Plant + (ML18016A265)
- HNP-98-003, Forwards Response to Exercise Weakness Identified in Paragraph P4.8 of NRC Insp Rept 50-400/97-11 Transmitted by Ltr + (ML18016A272)
- HNP-98-002, Forwards Proprietary Notification of Changes in RO & SRO Status.Encl Withheld Per 10CFR2.790(a)(6) + (ML18016A273)
- ML18016A276 + (ML18016A276)
- ML18016A278 + (ML18016A278)
- ML18016A279 + (ML18016A279)
- ML18016A281 + (ML18016A281)
- ML18016A284 + (ML18016A284)
- HNP-98-004, Monthly Operating Rept for Dec 1997 for Shearon Harris Nuclear Plant,Unit 1 + (ML18016A285)
- IR 05000400/1997010 + (ML18016A286)
- HNP-98-010, Forwards Rev 0 to Procedure HNP-ISI-002, Shearon Harris Nuclear Power Plant,Isi Program Plan,2nd Interval. Plan Describes Exams & Schedules for Performing ASME Code Insps of Class 1,2 & 3 Components & Supports + (ML18016A288)
- ML18016A289 + (ML18016A289)
- HNP-98-012, Forwards Listed Emergency Planning Info in Response to NRC Administrative Ltr 94-07, Distribution of Site-Specific & State Emergency Planning Info. W/O Encl + (ML18016A290)
- ML18016A291 + (ML18016A291)
- ML18016A293 + (ML18016A293)
- ML18016A296 + (ML18016A296)
- ML18016A298 + (ML18016A298)
- HNP-98-013, Responds to NRC Re Violations Noted in Insp Rept 50-400/97-12.Corrective Actions:Temporary Interim Action Will Remain in Place Until Specific Procedural Requirements Are Implemented + (ML18016A302)
- HNP-98-011, Forwards Rev 0 to Procedure HNP-IST-002, Shearon Harris Nuclear Power Plant,Ist Program Plan - 2nd Interval. Plan Describes Tests Required to Verify Operational Readiness of Class 1,2 & 3 Pumps & Valves + (ML18016A303)
- ML18016A304 + (ML18016A304)
- ML18016A305 + (ML18016A305)
- ML18016A308 + (ML18016A308)
- HNP-98-007, Forwards Listed Info in Response to GL 97-04, Assurance of Sufficient NPSH for ECC & Containment Heat Removal Pumps + (ML18016A309)
- ML18016A311 + (ML18016A311)
- ML18016A312 + (ML18016A312)
- 05000400/LER-1998-001, :on 980109,potential Condition Outside Design Basis Related to Instrument Air Sys Leak Causing SG pre- Heater Bypass Isolation Valves to Be Inoperable Was Noted. Caused by Inadequate Design Control.Generated Jco 98-01 + (ML18016A313)
- HNP-98-016, Provides Proprietary Notification That Reactor Operator Licensed on Plant Reassigned from Position for Which Util Previously Certified Need for Reactor Operator License.Encl Withheld (Ref 10CFR2.790(a)(6)) + (ML18016A314)
- HNP-98-018, Monthly Operating Rept for Jan 1998 for Shearon Harris Nuclear Power Plant + (ML18016A318)
- ML18016A319 + (ML18016A319)
- ML18016A320 + (ML18016A320)
- ML18016A322 + (ML18016A322)
- ML18016A323 + (ML18016A323)
- ML18016A326 + (ML18016A326)
- ML18016A327 + (ML18016A327)
- ML18016A328 + (ML18016A328)
- 05000400/LER-1998-003, :on 980129,failure to Perform Shutdown Margin Calculation Required by TS Surveillance Requirements Occurred.Caused by Ambiguity in TS 3.1.3.1.c.Procedures Revised + (ML18016A329)
- HNP-98-030, 1997 Annual Operating Rept of Individuals Receiving Exposures Greater than 100Mr/Yr + (ML18016A330)
- IR 05000400/1997012 + (ML18016A331)
- ML18016A332 + (ML18016A332)
- ML18016A333 + (ML18016A333)
- ML18016A337 + (ML18016A337)
- ML18016A338 + (ML18016A338)
- ML18016A339 + (ML18016A339)
- ML18016A341 + (ML18016A341)
- 05000400/LER-1997-021-02, Forwards LER 97-021-02,describing Addl Condition Identified During on-going TS Surveillance Procedure Review Project.Rev Includes Update to CAs + (ML18016A342)
- ML18016A343 + (ML18016A343)
- HNP-98-031, Responds to NRC GL 97-05, Steam Generator Tube Insp Techniques, for Harris Nuclear Plant + (ML18016A345)