Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17348B320 + (ML17348B320)
- 05000250/LER-1991-011, :on 911011,Appendix R Safe Shutdown Analysis Design Inadequacy Identified Due to Failure to Recognize Potential for Spurious Actuation of Auxiliary Relay.Manual Action List in Safe Shutdown Analysis Revised + (ML17348B321)
- 05000251/LER-1991-007-02, :on 911210,completion of TS Required Shutdown Due to Failure of 4A Load Sequencer.Caused by Auto Test Output Card.Unit Shut Down on 911210 & Output Contact Card Replaced + (ML17348B325)
- ML17348B326 + (ML17348B326)
- IR 05000250/1991046 + (ML17348B328)
- ML17348B329 + (ML17348B329)
- L-92-009, Monthly Operating Repts for Dec 1991 for Turkey Point Units 3 & 4 + (ML17348B333)
- ML17348B336 + (ML17348B336)
- IR 05000250/1991049 + (ML17348B338)
- IR 05000250/1991042 + (ML17348B339)
- ML17348B340 + (ML17348B340)
- IR 05000250/1991035 + (ML17348B341)
- ML17348B342 + (ML17348B342)
- ML17348B344 + (ML17348B344)
- ML17348B345 + (ML17348B345)
- ML17348B346 + (ML17348B346)
- IR 05000250/1991051 + (ML17348B348)
- L-92-006, Cycle XIII Startup Rept + (ML17348B349)
- ML17348B350 + (ML17348B350)
- ML17348B351 + (ML17348B351)
- L-91-267, Responds to Generic Ltr 91-11, Resolution of Generic Issues 48, LCOs for Class 1E Vital Buses & 49, Interlocks & LCOs for Class 1E Tie Breakers + (ML17348B352)
- ML17348B353 + (ML17348B353)
- L-92-012, Forwards ISI Summary Rept,Second Interval,Third Period, First Outage (1991) + (ML17348B354)
- ML17348B355 + (ML17348B355)
- ML17348B356 + (ML17348B356)
- ML17348B357 + (ML17348B357)
- ML17348B358 + (ML17348B358)
- ML17348B359 + (ML17348B359)
- ML17348B360 + (ML17348B360)
- L-92-016, Responds to Violations Noted in Insp Repts 50-250/91-45 & 50-251/91-45.Corrective Actions:Parameters Used in Eagle 21 Portion of RPS Verified,Consolidation Matrix & Training Program Prepared + (ML17348B361)
- ML17348B362 + (ML17348B362)
- ML17348B364 + (ML17348B364)
- ML17348B368 + (ML17348B368)
- ML17348B370 + (ML17348B370)
- ML17348B371 + (ML17348B371)
- ML17348B376 + (ML17348B376)
- ML17348B378 + (ML17348B378)
- ML17348B380 + (ML17348B380)
- ML17348B381 + (ML17348B381)
- ML17348B382 + (ML17348B382)
- IR 05000250/1991050 + (ML17348B384)
- ML17348B385 + (ML17348B385)
- ML17348B386 + (ML17348B386)
- ML17348B389 + (ML17348B389)
- ML17348B390 + (ML17348B390)
- L-92-035, Monthly Operating Repts for Jan 1992 for Turkey Point,Units 3 & 4 + (ML17348B391)
- ML17348B396 + (ML17348B396)
- IR 05000250/1992002 + (ML17348B398)
- ML17348B399 + (ML17348B399)
- L-92-013, Provides Status of Remaining Design Basis Document Verification & Component Design Review Verification Items to Be Completed by FPL + (ML17348B400)
- ML17348B401 + (ML17348B401)