Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-83-126, Forwards Owners Data Repts for Inservice Insp (Form NIS-1) & Repairs/Replacement (Form NIS-2),per Provisions of ASME Code + (ML17345A983)
- ML17345A984 + (ML17345A984)
- ML17345A985 + (ML17345A985)
- L-83-136, Forwards Steam Generator Repair Program,Radiological Progress Rept 2 for 821203-830202 + (ML17345A987)
- ML17345A988 + (ML17345A988)
- ML17345A989 + (ML17345A989)
- ML17345A990 + (ML17345A990)
- L-83-131, Advises of Withdrawal of Request for Exemption from Certain Requirements of 10CFR73.21,per .Facilities in Compliance W/Applicable Sections + (ML17345A991)
- L-83-135, Forwards Responses to Generic Ltr 82-28 Re Inadequate Core Cooling Instrumentation Sys for Facilities.W/Nine Oversize Drawings.Aperture Cards Are Available in PDR + (ML17345A992)
- ML17345A993 + (ML17345A993)
- ML17345A994 + (ML17345A994)
- ML17345A995 + (ML17345A995)
- ML17345A996 + (ML17345A996)
- ML17345A997 + (ML17345A997)
- ML17345A998 + (ML17345A998)
- ML17345A999 + (ML17345A999)
- ML17345B000 + (ML17345B000)
- ML17345B001 + (ML17345B001)
- ML17345B002 + (ML17345B002)
- ML17345B003 + (ML17345B003)
- ML17345B004 + (ML17345B004)
- ML17345B005 + (ML17345B005)
- ML17345B006 + (ML17345B006)
- L-83-146, Forwards Evaluation of Acceptability of Reactor Vessel Head Lift Rig,Reactor Vessel Internals Lift Rig,Load Cell,Load Cell Linkage & Reactor Coolant Pump Motor Lift Sling to Requirements of NUREG-0612, in Response to + (ML17345B007)
- ML17345B011 + (ML17345B011)
- ML17345B013 + (ML17345B013)
- ML17345B014 + (ML17345B014)
- ML17345B016 + (ML17345B016)
- L-83-155, Forwards Corrected Page 3 to 830315 Submittal, Control of Heavy Loads, Technical Evaluation Rept + (ML17345B017)
- L-83-162, Informs That Projected Operability Dates for Air Ejector Effluent Radiation Monitors of 830321 & 0915 Will Not Be Met.Progress Rept on Moisture Accumulation Problem Expected by 830601 + (ML17345B018)
- ML17345B022 + (ML17345B022)
- ML17345B024 + (ML17345B024)
- ML17345B025 + (ML17345B025)
- ML17345B026 + (ML17345B026)
- ML17345B027 + (ML17345B027)
- L-83-180, Forwards Info Presented at 830126 Meeting Re Plans & Schedules to Resolve Pressurized Thermal Shock at Facilities,In Response to NRC 830201 Request.Util Plans to Focus Effort on Flux Reduction to Reactor Vessel Inner Wall + (ML17345B029)
- L-83-179, Forwards Corrected Pages from Util Re Adequacy of Station Electric Distribution Sys Voltages Covering ESF Setpoints + (ML17345B030)
- L-83-188, Confirms Agreement Re Conformance W/Schedule Required by Final Rule 10CFR50.49,in Response to NRC 821213 Request Concerning Environ Qualification of safety-related Electrical Equipment + (ML17345B031)
- L-83-208, Requests Relief from Commitment Dates in 830314 Order Re Resolution of TMI Items II.F.1.2, Air Ejector Effluent Monitor, & II.F.1.6, Containment Hydrogen Monitors. Request Based on Unsuccessful Preoperational Testing + (ML17345B032)
- L-83-194, Ack Receipt of Re Blocking of Steam Line High Differential Pressure Safety Injection Signal During Cooldown.Response Will Be Provided by 830419 + (ML17345B033)
- ML17345B035 + (ML17345B035)
- ML17345B037 + (ML17345B037)
- ML17345B039 + (ML17345B039)
- L-83-225, Forwards Revised Fuel Protection Review, Including Request for Exemptions from App R + (ML17345B040)
- L-83-223, Commits to Test All Affected Equipment & Perform Surveillances Required by Tech Specs,Per ,During Steam Generator Repair Outage Prior to Fuel Reload + (ML17345B045)
- L-83-226, Responds to 830331 Request for Relief from Operability Dates for NUREG-0737, Items II.F.1.2, Air Ejector Effluent Monitor & II.F.1.6, Containment Hydrogen Monitor. Completion for Both Items Expected by 840515 + (ML17345B046)
- L-83-224, Forwards Dp Hodel Certifying That Util Is Actively & in Good Faith Negotiating W/Doe for Nuclear Waste Disposal Contract Per Requirement of Nuclear Waste Policy Act of 1982 + (ML17345B047)
- L-83-221, Confirms Commitment to Advise of Any Final Changes to NPDES Permit & Any Permit Violations + (ML17345B048)
- L-83-232, Advises of Initiation of Development of plant-specific Procedures & Performance of Fuel cycle-specific Calculations Utilizing Westinghouse Rod Swap Methodology Outlined in WCAP-9863 & WCAP-9864 + (ML17345B049)
- L-83-228, Advises of Completion of Review of Re Blocking of Safety Injection Signals During Plant Cooldown.Tech Spec Change to Be Submitted to Clarify Operating Bypass Condition + (ML17345B051)
- L-83-237, Responds to Generic Ltr 82-33 (NUREG-0737,Suppl 1) Re Emergency Response Capability.Proposed Implementing Schedules Encl + (ML17345B053)