Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17341A992 + (ML17341A992)
- ML17341A994 + (ML17341A994)
- ML17341A995 + (ML17341A995)
- ML17341A996 + (ML17341A996)
- ML17341A997 + (ML17341A997)
- IR 05000250/1981033 + (ML17341A998)
- ML17341B000 + (ML17341B000)
- ML17341B001 + (ML17341B001)
- L-82-118, Forwards Response to NRC 820211 Request for Addl Info Re NUREG-0737,Item II.K.3.2 Re Power Operated Relief Valve Isolation Sys + (ML17341B002)
- L-82-127, Responds to Generic Ltr 81-36 Re Submittal of Preliminary Evaluation Supported by Test Results to Demonstrate Capability of PWR Relief & Safety valves.Plant-specific Evaluation Will Be Submitted by 820901 + (ML17341B004)
- L-82-130, Submits Update Re Implementation of Containment High Range Radiation Monitors.Calibr of Unit 4 Channels Rescheduled for Next Outage,For Health Physics Reasons.Unit 3 Calibr Complete + (ML17341B006)
- ML17341B010 + (ML17341B010)
- ML17341B011 + (ML17341B011)
- ML17341B012 + (ML17341B012)
- ML17341B013 + (ML17341B013)
- ML17341B014 + (ML17341B014)
- L-82-131, Submits Procedures to Preclude Effects of Foreign Matl in Primary Coolant Sys & Not Retrieved Per Steam Generator Repair Program + (ML17341B015)
- L-82-133, Forwards Steam Generator Repair Program,Radiological Progress Rept,811231-820303 + (ML17341B016)
- ML17341B017 + (ML17341B017)
- ML17341B018 + (ML17341B018)
- ML17341B021 + (ML17341B021)
- ML17341B022 + (ML17341B022)
- L-82-139, Forwards Status of Post-TMI Items II.B.1,II.B.2,II.D.3, II.B.3,II.E.1.1,II.E.1.2.(2.C) & II.E.4.2.Details on Open Items Will Be Submitted in Response to Generic Ltr 82-05 by 820421 + (ML17341B023)
- L-82-135, Requests Permission to Retain Contaminated Soil Onsite. Evaluation of Potential Migration from Contaminated Soil Encl + (ML17341B025)
- ML17341B026 + (ML17341B026)
- ML17341B027 + (ML17341B027)
- ML17341B028 + (ML17341B028)
- L-82-157, Advises That Response to Generic Ltr 82-05 Will Be Submitted by 820426 + (ML17341B030)
- ML17341B033 + (ML17341B033)
- ML17341B035 + (ML17341B035)
- ML17341B036 + (ML17341B036)
- ML17341B040 + (ML17341B040)
- ML17341B041 + (ML17341B041)
- ML17341B042 + (ML17341B042)
- L-82-149, Application for Amend to App a Tech Specs of Licenses DPR-31 & DPR-41,incorporating 5% Steam Generator Tube Plugging ECCS Analysis + (ML17341B043)
- ML17341B044 + (ML17341B044)
- ML17341B045 + (ML17341B045)
- L-82-167, Suppl to 820421 Proposed Amend to OLs Re Hot Channel Factor Normalized Operating Envelope + (ML17341B047)
- L-82-169, Responds to 820316 Request for Info Re Inservice Insp Program.Info Will Not Be Provided Until 820601 Due to Extensive Amount of Matl & Detailed Nature of Subj + (ML17341B048)
- L-82-165, Requests That Facility Be Authorized to Operate for Addl 4 Equivalent full-power Months Prior to Performing Next Steam Generator Insp.Request Classifies as Class Iii. Fee Encl + (ML17341B056)
- IR 05000244/2018403 + (ML17341B062)
- STC-18-004, Notification of an Additional Offering of the U.S. Nuclear Regulatory Commission Materials Control, Security Systems and Principles (S-201) Course and on-line Gap Training + (ML17341B088)
- ML17341B100 + (ML17341B100)
- L-82-166, Application to Amend Licenses DPR-31 & DPR-41 Tech Specs Re Description of Hot Channel Factor Normalized Operating Envelope Curve + (ML17341B101)
- ML17341B102 + (ML17341B102)
- ML17341B103 + (ML17341B103)
- ML17341B104 + (ML17341B104)
- L-82-170, Discusses Status of Assessment Re Effect of Loss of Ventilation on Postulated Loss of All Ac Power Event. Facility Environ Conditions for Loss of Ventilation Will Be Completed by End of May 1982 + (ML17341B106)
- ML17341B107 + (ML17341B107)
- ML17341B109 + (ML17341B109)
- ML17341B110 + (ML17341B110)