ML17341B110

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amend 85 to License DPR-31
ML17341B110
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 04/21/1982
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17341B108 List:
References
NUDOCS 8205030662
Download: ML17341B110 (4)


Text

7590-01 V

UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-250 FLORIDA POMER AND LIGHT COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 85 to Facility Operating License No.

DPR-31 issued to Florida Power and Light Company (the licensee),

which revised Technical Specifications for operation of the Turkey Point Plant Uni t No.

3 (the facility) located in the Dade County, Florida.

The amendment was effective on April 5, 1982.

The amendment permits operation of Unit 3 for low power physics tests with Unit 4 operating at full power and only two boric acid transfer pumps operable.

The amendment was authorized on an expedited bases to permit plant startup.

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations.

The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Prior public notice of this amendment was not required since this amendment does not involve a significant hazards consideration.

The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and th4 pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.

l

~i ~

I

/gpss g ag

h g

~

For further details with respect to this action, see (1) the request for amendment dated April 5, 1982, (2) the Commission's letter to the licensee dated April 6, 1982, (3) Amendment No. 85 to License No.

DPR-31, and (4) the Comnission's related Safety Evaluation.

All of these items are available for public inspection at the Commission's Public Document

Room, 1717 H Street, N.W., Washington, D.C.

and at the Environmental and Urban Affairs Library, Florida International University, Miami, Florida 33199.

A copy of items (2), (3), and (4) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D.C.

20555, Attention:

Director, Division of Licensing.

Dated at Bethesda, Maryland, this 21st day of April, 1982.

FOR'THE NUC E

REGULATORY COMMISSION e

k. alg, Cie Operating Reactor ranch 41 Division of Licens g

h