ML17341A996
| ML17341A996 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 01/21/1982 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17341A993 | List: |
| References | |
| NUDOCS 8204010438 | |
| Download: ML17341A996 (4) | |
See also: IR 05000250/1981033
Text
SAN PI tggg
Florida Power and Light Company
ATTN:
Dr.
R.
E. Uhrig, Vice President
Advanced
Systems
and Technology
P. 0.
Box 529100
Miami, FL
33152
Gentlemen:
Subject:
Report
Nos
0-250/81-33
a
50-251/81-33
This refers
to the routine safety inspection
conducted
by Mr.
R. J. Vogt-Lowell
of this office on October
26 - November
25 and
December 7-18,
1981, of activities
authorized
by
NRC Operating
License
Nos.
DPR-31 and
DPR-42 for the Turkey Point
facility.
Our preliminary findings were discussed
with Mr. J.
K. Hays, Plant
Manager, at the conclusion of the inspection.
Areas
examined
during the inspection
and our findings are discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
During the inspection, it was found that certain activities under your license
appear
to violate
NRC requirements.
These
items
and references
to pertinent
requirements
are listed in the Notice of Violation enclosed
herewith
as
Appendix A.
Elements
to
be included in your response
are delineated
in
Appendix A.
This also confirms the telephone
conversation
on November 6, 1981,
between
Mr. H.
C.
Dance, Chief, Reactor Projects
Section
2C, of our office and
Mr. K. N. Harris, Assistant
Manager,
Nuclear Energy, of your staff.
This
conversation
expressed
our concern
over the plugging of the boron injection tank,
inlet pi ping.
This concern relates
to the conditions or circumstances
that
caused this event
and the adequacy
and
scope of your corrective actions
taken to
prevent recurrence.
Consequently,
your reply should describe
in particular those
actions
taken or planned to improve the effectiveness
of your management
controls
in these
areas.
We have
examined actions
you have taken with regard to previously reported
unresolved
items.
The status of these
items is discussed
in the enclosed
report.
In accordance
with 10
CFR 2.790(a),
a copy of this letter and the enclosures will
be placed in the
NRC's Public Document
Room unless
you notify this office, by
telephone,
within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter.
Such application must
be consistent with the requirements
of 2.790(b)(l).
82040i0438
820323
ADQCK 05000250
,;, 6
E
l
I
fl
y t
~
'
~
I
I'
w "6'a'Qk g~ -<<'y~w- ~i+ A(
~ )g4'~.
w~'~psi yp~ v'> i'W~p
Florida Power 5 Light Company
~<~ a1
~ceo
The responses
directed
by this letter and the enclosures
are not subject to the
clearance
procedures
of the Office of Management
and Budget as required
by the
Paperwork
Reduction Act of 1980,
PL 96-511.
Should you have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Enclosures:
l.
Appendix A, Notice of Violation
2.
Inspection
Report
Nos. 50-250/81-33
and 50-251/81-33
~
~
cc w/encl:
H.
E. Yaeger, Site lianager
bcc w/encl:
NRC Resident
Inspector
Document
management
Branch
State of Florida
R.
C. Lewis, Director
Division of Resident
and
Reactor Project Inspection
R I
RV
t-Lowel1:dt
1/
/82
R I
KL
di s
1/
82
HCDance
1/~ /82
RII
PJKel-logg:
1/
/82
CLewis
1/ ) /82