APR 0 ~ 1982 Distr ibution:
Docket Fil e NRC PDR Local PDR ORB IIl Rdg DEisenhut OELD OI8E (1)
HGrotenhui s JTBeard CParrish I'lSI C JHel temes Docket Hos. 50-250 50-251 Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power and Light Company Post Office Box 529100 Miami, Florida 33152
'g~
9
<p~q-91982~
tO
@ gggq <mme~
llCC
Dear Dr. Uhrig:
ACRS (10) lie have completed our preliminary review of your letters dated Sep II 1981 which provided information related to the auxiliary feedwater sys design for the Turkey Point Plant Unit Nos.
3 and 4.
Me find that we
-need the information identified in the enclosure to this letter in order to complete our review.
Please provide the information within 45 days of the receipt of'this letter.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, ONB clearance is not required under P.L.96-511.
Sincerely, PrLgin'al signag by.
S. A. Var~a Steven A. Yarga, Chief Operating Reactors Branch Pl Division of Licensing
Enclosure:
As stated cc w/encl:.
See next page sso4oooO IIt OFFICE IP SURNAME/
DATE$
DL'
~ 0 ~ 0 ~ ~ 0
~ ~ ~ ~ ~ 1 ~ 0 ~
.[1':qg.qp.hAU.g 4/b /82
~I~ 4 ~
~ ~
~ 0 ~otÃ0 ~ 0 ~
~ ~
D 0'
4 Bkl 6 arse..
~
~ ~
/82
~ ~ ~ ~ ~ ~ 0 ~ 0 ~I~
~
~ 0 ~ 0 ~ 0 ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
~
~ ~
~\\ ~ 0 ~I~I~ ~I~ ~ ~ 0 ~ ~ ~ ~ ~ ~
~
~ 0 ~ ~ItttO~
NRG FORM 318 (1940) NRCM 0240 0FFlC lAL R EGO R D.COPY USQPO: 1981~960
~i C
Robert E. Uhrig Florida Power and"Light Company CC:
Mr. Robert Lowenstein, Esquire Lowenstein, Newman, Reis and Axelrad 1025 Connecticut Avenue, N.W.
Suite 1214 Washington, D. C.
20036 Environmental and Urban Affairs Library Florida International University Miami, Florida 33199 Mr. Norman A. Coll, Esquire
- Steel, Hector and Davis 1400 Southeast First National Bank Building
'Miami, Florida 33131 Mr. Henry Yaeger, Plant Manager Turkey Point Plant Florida Power and Light Company P. 0. Box 013100 Miami, Florida 33101 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Resident Inspector Turkey Point Nuclear Generating Station U. S. Nuclear Regulatory Commission Post Office Box 1207
'Homestead,, Florida 33030 James P. O'Reilly Regional Administrator - Region II U. S. Nuclear Regulatory Commission 101 'Marietta Street - Suite 3100 Atlanta, Georgia 30303
ii
Turke Point Nuclear Plant Units 3 h, 4 SEISMIC QUALIFICATION DF THE AUXILIARYFEEDWATER SYSTEM REQUEST FOR'EOITIONAL INFORhiATION'uestion 1:
Enclosure 1 of Generic Letter 81-14 (GL 81-14) oefines the auxiliary feedwater (PW) system to be cons'ioered as:
(a)
"The AFW system bounoary from suction to discharoe (including the w-ter source ano heat sink) shall include those portions of the system required'o accomplish the AFW system funct'on ano connected branch piping up to and including the secono valve which is normally closed or capable of automatic closure when the safety function is requireo."
,(b)
"The AFW system bounoary shall also include any portion of branch piping that is structurally coupled to the AFW system boundary such that the seismic, response of the branch piping transmits loads to the AFW system.
As a minimum, this includes the branch lines outside the AFW system boundary to a point of three orthooonal restraints."
(c)
"Allmechanical and electrical equipment, piping (e.g.,
instrument air.), conduits and cable trays, which are necessary or contain items which are necessary for the operation of the AFW system, shall also be considered."
(d)
"In addition, the structures housing these systems and components shall be included.
0 Q 10
Clarify the extent to which your AFW system 'bounoary, considered in your September 16, 1981 response letter, icoincioes with the bounoary oefineo in GL 81-14, especially parts
('a) and (b) above.
Generic Letter 81-14 states:
"The results of any walk-oown are requested within '20 cays of receipt of this letter.
These results should incluo all identified defici'encies and all corrective actions taken, or planned alono with the schedules for such."
Our review of your response to Generic Letter 81-14 indicates that your response to this request is incomplete.
Please provide schedules of planned corrective actions for (a) disconnecting the branch lines from the AFW pump suction to the condensate transfer punp ano the condensate recovery transfer pump, (b) the installation of a new demineralized water system, (c) aaditions of reoundant safety-grade indication, and the trip and throttle valves, and (d) upgradino of AFW flow control indication.
iO
'