Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-81-297, Responds to Generic Ltr 81-14 Re Seismic Qualification of Auxiliary Feedwater Sys.Sys Is Seismically Designed Per FSAR & Constructed & Maintained Consistent W/Other safety-grade Sys Inplant.Addl Info Will Be Provided by 810915 + (ML17341A361)
- L-81-291, Provides Info Re EPRI Safety & Relief Valve Test Program. Copes-Vulcan D-100-160 Relief Valve & Crosby Model HB-BP-86 Safety Valve Are Being Tested as Part of Program.Evaluations & plant-specific Data Will Be Submitted + (ML17341A362)
- IR 05000250/1981009 + (ML17341A363)
- L-81-250, Ack Receipt of IE Insp Repts 50-250/81-09 & 50-251/81-09 on 810406-10 & 13-17.No Proprietary Info.Corrective Actions:Ltr Issued Emphasizing Proper Review Channels for Special Tests + (ML17341A365)
- ML17341A369 + (ML17341A369)
- ML17341A370 + (ML17341A370)
- ML17341A372 + (ML17341A372)
- L-81-311, Forwards Response to NRC 810608 Request for Addl Info Re Auxiliary Feedwater Automatic Initiation & Flow Indication. Preliminary Diagrams Provided + (ML17341A376)
- ML17341A380 + (ML17341A380)
- ML17341A383 + (ML17341A383)
- ML17341A384 + (ML17341A384)
- L-81-313, Application for Amend to App a of Licenses DPR-31 & DPR-40, Allowing Up to 36 Assemblies of Unit 3 Region 10 Fuel to Be Removed from Unit 3 Spent Fuel Pit After Decay Period of 95 Days,Instead of Required 120 Days.Fee Encl + (ML17341A390)
- ML17341A391 + (ML17341A391)
- ML17341A392 + (ML17341A392)
- L-81-323, Requests Extension of Schedule for Completing Fire Protection Mods.Procurement Problems Have Caused Delivery Date of Remaining Emergency Diesel Generator Tank Isolation Valves to Slip to 810901.Completion Scheduled for 811101 + (ML17341A398)
- ML17341A400 + (ML17341A400)
- L-81-329, Application for Amend to License DPR-41 to Authorize Facility Operation for Addl Two Equivalent Full Power Months Prior to Performing Next Steam Generator Insp + (ML17341A402)
- L-81-272, Responds to NRC Re Violations & Deviation Noted in IE Insp Repts 50-250/81-11 & 50-251/81-11 on 810427-30. Corrective Actions:Improper Tubing Removed & Rerouted + (ML17341A403)
- ML17341A404 + (ML17341A404)
- ML17341A405 + (ML17341A405)
- ML17341A406 + (ML17341A406)
- ML17341A407 + (ML17341A407)
- ML17341A410 + (ML17341A410)
- ML17341A412 + (ML17341A412)
- ML17341A413 + (ML17341A413)
- PNP 2017-050, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile Protection + (ML17341A415)
- IR 05000250/1981010 + (ML17341A416)
- ML17341A417 + (ML17341A417)
- IR 05000250/1981014 + (ML17341A420)
- L-81-330, Advises That Reactor Has Been Defueled Due to Outage for Steam Generator Repair.Equipment Will Be Tested Prior to Reload When Normal Surveillance Testing Frequency Will Be Resumed + (ML17341A422)
- ML17341A423 + (ML17341A423)
- ML17341A424 + (ML17341A424)
- L-81-343, Responds to NUREG-0737,TMI Action Plan Item II.k.3.5 Re Reactor Coolant Pump Automatic Trip in Event of Loca.Concurs W/Westinghouse Owners Group 810615 Proposal to Submit Trip Design After NRC Approval of Small Break Mode 1 + (ML17341A425)
- L-81-339, Outlines Westinghouse Topical Repts Re Evaluation of Effects of Asymmetric LOCA Loads as Applicable to Facility.Repts Are Part of Response to 780125 Info Request.Submittal Completes Util Planned Effort Re Task Action Plan A-2 + (ML17341A427)
- ML17341A428 + (ML17341A428)
- ML17341A429 + (ML17341A429)
- ML17341A430 + (ML17341A430)
- ML17341A431 + (ML17341A431)
- L-81-346, Advises That Procedure MRS 2.2.2 GEN-15 & Change 1 ,re Steam Generator Repair Channel Head Decontamination,Provided to Resident Inspector.Work Scheduled for 810817 + (ML17341A433)
- L-78-206, Forwards Info from Diesel Generator Questionnaire,In Response to NRC + (ML17341A434)
- L-81-345, Informs That Operator Shifts Will Be Limited to Two Shifts Approx 12-h Long for Transferring Spent Fuel from One Spent Fuel Pit to Other.Previous Shifts Were Limied to Three Shifts Approx 8-h Long + (ML17341A436)
- L-81-174, Responds to NRC Re Violations Noted in IE Insp Rept 50-250/81-01.Corrective Actions:Surveillance Area Redefined,Permanent Red Colored Floor Tiles Installed & Changes Made to Administrative Procedure 0103.2 + (ML17341A437)
- ML17341A439 + (ML17341A439)
- IR 05000250/1981001 + (ML17341A440)
- ML17341A442 + (ML17341A442)
- ML17341A446 + (ML17341A446)
- ML17341A448 + (ML17341A448)
- ML17341A449 + (ML17341A449)
- L-81-349, Advises That Dolan Farm Radiological Sample Shed Will Be Moved Approx 200 Yards Southeast.Present Location Has Left Shed Vulnerable to Repeated Acts of Vandalism.New Location Will Be within Weyerhauser Corp Security Area + (ML17341A450)
- L-81-357, Notifies That Proposed Changes to Radiological Effluent Tech Specs Submitted on 790417 Will Be Resubmitted by 811130.Tech Specs Will Include Changes in Equipment & Operating Conditions That Have Occured in Past 2 Yrs + (ML17341A451)
- ML17341A459 + (ML17341A459)