ML17341A391

From kanterella
Jump to navigation Jump to search
Application for Amend to App a of Licenses DPR-31 & DPR-40, Allowing Up to 36 Assemblies of Unit 3 Region 10 Fuel to Be Removed from Unit 3 Spent Fuel Pit After Decay Period of 95 Days,Instead of Required 120 Days.Fee Encl
Date released: 07/31/2018 Download: ML17341A391


Proposed Tech Spec Page 3.12-1 Adding Footnote to Change Period for Decay of Region 10 Fuel in Unit 3 Reactor from 120 to 95 Days.Safety Analysis & Bases & Background Encl
ML17341A392
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 07/23/1981
From:
FLORIDA POWER & LIGHT CO.
To:
References
Download: ML17341A392 (8)
Application for Amend to App a of Licenses DPR-31 & DPR-40, Allowing Up to 36 Assemblies of Unit 3 Region 10 Fuel to Be Removed from Unit 3 Spent Fuel Pit After Decay Period of 95 Days,Instead of Required 120 Days.Fee Encl
ML17341A390
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 07/23/1981
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: EISENHUT D G
Office of Nuclear Reactor Regulation
References
Download: ML17341A390 (4)