APPENDIX A NOTICE OF VIOLATION Florida Power and Light Turkey Point Unit 3 Docket No. 50-250 License No. DPR-31 As a result of the inspection conducted on March 26 April 25,

1981, and in accordance with the Interim Enforcement
Policy, 45 FR 66754 (October 7, 1980),

the following violation was identified.

Technical Specification 6.8. 1 requires written procedures and administrative policies be established, implemented, and maintained for safety-related equipment.

Administrative Procedure 0190. 19, Control of Maintenance on Nuclear Safety-Related Equipment, requires that work on safety-related

'equipment be accomplished per a plant work order.

Contrary to the above, Administative Procedure 0190. 19 was not followed in that on April 13,

1981, the back-up nitrogen supply system for the pressurizer power operated relief valves was found to be isolated and a

properly authorized Plant Work Order had not been initiated for the work which apparently caused the valves to be shut.

The Unit was in a shutdown condition when the valves were found closed.

This is a Severity Level V Violation (Supplement I.E.).

Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within twenty-five days of the date of this Notice, a written statement or explanation in reply, including:

(1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (S) the date when full compliance will be achieved.

Under the authority of Section 182 of the Atomic Energy Act of 19S4, as

amended, this response shall be submitted under oath or affirmation.