- ML17339B083 + (ML17339B083)
- L-80-171, Application to Amend App a of Licenses DPR-31 & DPR-41, Changing Tech Specs,Pages 3.2-2 & 3.2-4,to Reflect Results of Revised ECCS Analysis of Power Distribution Limits for 25% Steam Generator Tube Plugging.Revised Tech Specs Encl + (ML17339B085)
- ML17339B086 + (ML17339B086)
- ML17339B087 + (ML17339B087)
- ML17339B088 + (ML17339B088)
- ML17339B089 + (ML17339B089)
- IR 05000250/1980014 + (ML17339B091)
- 05000250/LER-1980-007, Forwards LER 80-007/03L-0 + (ML17339B092)
- ML17339B093 + (ML17339B093)
- 05000250/LER-1980-007-03, /03L-0:on 800424,during Planning & Implementation of Surveillance Per Tech Spec 4.15.4.a.1,six Electrical Penetration Fire Barriers Found Nonfunctional.Caused by Incomplete Installation.Barriers Repaired + (ML17339B094)
- ML17339B095 + (ML17339B095)
- ML17339B096 + (ML17339B096)
- L-80-158, Corrects & Supplements to NRC Re Proposed Amends to OL Permitting Steam Generator Repairs.Util Has Approved Various Plant Improvements,Including Installation of Condensate Polishing Demineralizers + (ML17339B097)
- L-80-172, Notifies That Revised Emergency Plan Will Be Submitted by 800615,in Response to NRC + (ML17339B098)
- L-80-174, Forwards Safe Shutdown Evaluations for Auxiliary Bldg Hallway & Cable Spreading Room in Response to NRC 791029 Request for Fire Protection Info.Reactivity Control Sys Assures Safe Subcritical Core Conditions After Reactor Trip + (ML17339B099)
- ML17339B100 + (ML17339B100)
- L-80-155, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/80-08 & 50-251/80-08.Corrective Actions: Personnel Counseled in Correct Procedural Compliance. Notation Made on Calibr Tickler Card + (ML17339B102)
- ML17339B103 + (ML17339B103)
- ML17339B104 + (ML17339B104)
- IR 05000250/1980008 + (ML17339B105)
- ML17339B107 + (ML17339B107)
- L-80-149, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/80-10 & 50-251/80-10.Corrective Actions: Preventative Maint to Be Performed on Critical Portions of Plant Communications Sys + (ML17339B109)
- L-80-141, Confirms,Per Conversation W/R Vogt-Lowell,that Response to IE Insp Repts 50-250/80-10 & 50-251/80-10 Will Be Submitted by 800509 + (ML17339B110)
- ML17339B111 + (ML17339B111)
- ML17339B112 + (ML17339B112)
- ML17339B113 + (ML17339B113)
- IR 05000250/1980010 + (ML17339B114)
- 05000251/LER-1980-003, Forwards Updated LER 80-003/03L-0 + (ML17339B115)
- ML17339B116 + (ML17339B116)
- 05000251/LER-1980-003-03, While Testing 4C Steam Generator Feedwater Control Valve,Change in Steam Generator Level Lifted Low Setpoint Valve.Valve Did Not Fully Reseat. Caused by Binding Between Lifting Gear & Release Nut + (ML17339B117)
- ML17339B118 + (ML17339B118)
- ML17339B119 + (ML17339B119)
- ML17339B120 + (ML17339B120)
- L-80-156, Responds to NRC Re Deviation Noted in IE Insp Repts 50-250/80-15 & 50-251/80-13.Corrective Actions:Mod Initiated to Install Audible & Visual Alarm for Loss of Voltage to Fire Pump + (ML17339B122)
- ML17339B123 + (ML17339B123)
- IR 05000250/1980015 + (ML17339B124)
- L-80-186, Forwards Info Re Addl TMI-related Requirements Per .Includes Shift Manning,Revising Scope & Criteria of Licensing Exams,Procedures for Feedback of Operating Experience to Plant Staff & PWR Vendor Rept + (ML17339B125)
- ML17339B126 + (ML17339B126)
- 05000250/LER-1980-011, Forwards LER 80-011/01T-0 + (ML17339B127)
- ML17339B128 + (ML17339B128)
- 05000250/LER-1980-011-01, /01T-0:on 800527,util Was Notified by NSSS Vendor That Nonconservative Error Had Been Discovered in Computer Inputs Used in Feb 1979 10CFR50.46 App K LOCA Analysis. Caused by Personnel Error + (ML17339B129)
- 05000251/LER-1980-008, Forwards LER 80-008/01T-0 + (ML17339B130)
- ML17339B131 + (ML17339B131)
- 05000251/LER-1980-008-01, /01T-0:on 800523,review of Radiographs Per IE Bulletin 79-13 Revealed Indications of Cracking in Feedwater Nozzle to Pipe Weld on Steam Generator 4 C Reducers.Cause Not Stated.Fittings Containing Defects Are Being Replaced + (ML17339B132)
- 05000250/LER-1980-010, Forwards LER 80-010/03L-0 + (ML17339B133)
- ML17339B134 + (ML17339B134)
- 05000250/LER-1980-009, Forwards LER 80-009/03L-0 + (ML17339B135)
- ML17339B136 + (ML17339B136)
- 05000250/LER-1980-010-03, /03L-0:on 800514,during Normal Operation,Process Radiation Monitors R-11 & R-12 Were Out of Svc for Approx 16-h.Caused by Failure of Air Sampling Blower Due to Normal Wear.Blower Replaced & Monitor Returned to Svc + (ML17339B137)
- 05000250/LER-1980-009-03, /03L-0:on 800511,while Performing OP 14004.1,steam Generator Protection Channels Periodic Test,Trip Setpoints of Bistable BS-3-475 & 485A Found Nonconservative.Caused by Instrument Drift.Bistables Reset + (ML17339B138)
- L-80-195, Forwards Proposed Revision to Emergency Plan.Apps to Be Submitted Under Separate Cover.Implementation to Begin by 810101,depending on Resource Availability & Final Resolution of Open Issues.Plan Withheld (Ref Privacy Act) + (ML17339B139)