ML17339B116

From kanterella
Jump to navigation Jump to search
Forwards Updated LER 80-003/03L-0
Date released: 07/31/2018 Download: ML17339B116


Updated LER 80-003/03L-0:on 800215,while Testing 4C Steam Generator Feedwater Control Valve,Change in Steam Generator Level Lifted Low Setpoint Valve.Valve Did Not Fully Reseat. Caused by Binding Between Lifting Gear & Release Nut
ML17339B117
Person / Time
Site: Turkey Point 
Issue date: 05/30/1980
From: Schoppman M
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17339B117 (2)
Forwards Updated LER 80-003/03L-0
ML17339B115
Person / Time
Site: Turkey Point 
Issue date: 05/30/1980
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17339B115 (2)